1) overhanging steel box girder
悬挑钢箱梁
1.
In this article,authors introduce the construction technology of the assembing,welding and hoisting of 71 meters span overhanging steel box girder in main stadium of Nanjing Olympic Sports Center.
介绍了南京奥体中心主体育场71m悬挑钢箱梁的拼装、焊接和吊装施工技术。
2) cantilevered steel box girder
悬臂钢箱梁
1.
Influenced by self gravity,wind and cantilevered stayed cable,cantilevered steel box girder of large-scale cablestayed bridge can vibrate in the installation process,its regime characteristics are in real-time monitoring with GPS RTK technique,and it has important significance for construction control of bridge.
大型斜拉桥悬臂钢箱梁在安装过程中受到自身重力、风力、悬臂斜拉索的影响发生振动,应用GPS RTK技术对其动态特性进行实时监测,对桥梁施工控制具有重要意义。
4) Large cantilevered beam with corrugated steel web
大悬臂波形钢腹板挑梁
5) steel reinforced concrete cantilever beam
钢骨混凝土悬挑梁
6) cantilever beam
悬挑梁
1.
A cantilever beam is lengthened from 1.
某结构改造中混凝土悬挑梁从1。
2.
The project of Jiangsu science history culture center is external prestressing in tubes of cantilever beam structure.
江苏省科学历史文化中心工程体外管内预应力吊拉多层大悬挑梁结构,有别于传统的施工方法,优点有:通过张拉拉索,在结构中建立有效、合理预应力,以平衡部分使用荷载,为悬挑结构提供弹性支点,控制结构变形,提高结构刚度,外形美观,使结构具有空间感;但该结构受力分析复杂,施工存在一定的难度,张拉不当可能会导致挑梁变形过大,应力超标,进而在挑梁根部产生裂缝。
3.
Through a calculation of the strength of normal section of extra-reinforced cantilever beam for an actual project,the conception of normal section of extra-reinforced cantilever beam is analyzed.
通过一工程实例中悬挑梁的正截面配筋计算,对钢筋混凝土悬挑梁正截面超筋的概念进行了分析和探讨。
补充资料:挑么挑六
1.挑剔,找差错。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条