1) altering fill
换填施工
1.
Combined with specific engineering, it demonstrates feasibility of altering fill for large area sand bed and introduces its application in engineering, and puts forward solution according to appeared problems, the experiences indicates effect is good.
通过工程实例,论证了选择大面积砂垫层换填施工的可行性,介绍了换填法在工程中的应用,并对应用中出现的问题,提出了解决措施,实践表明,大面积砂垫层换填施工取得了良好的效果。
2) replacement and refilling measures
换填措施
3) filling the soil and construction
填土施工
1.
The noise from filling the soil and construction is monitored.
监测了填土施工的环境噪声,结果表明:昼间等效声级低于国家标准,夜间超标19 8分贝,最大噪声级达103~110分贝。
4) filling construction
填筑施工
1.
The paper introduces the application of GPS in supervision,communication,positioning of filling construction of concrete face rockfill dam,some problems that should think in composition of supervision center and foundation of the system, as well as related soft wares.
介绍了全球定位系统在混凝土面板堆石坝填筑施工中监控、通讯、定位过程中的应用,以及监控中心的组成和建立系统时应考虑的问题,最后介绍了监控系统软件和数据通讯系统软件。
2.
According to the quality control needs of filling construction of the face rockfill dam, by means of the global satellite positioning technology, the wireless data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper.
针对面板堆石坝填筑施工的质量控制需要,利用全球卫星定位技术、无线数据通讯技术、计算机技术和数据处理与分析技术,结合碾压机械进行集成,研制了一套GPS实时监控系统,可用于填筑工程碾压施工质量的实时监控。
6) manual cut and replacement
人工换填
1.
Based on the analysis on the loading specialities of a ground during manual cut and replacement, the paper proposes the new suggestions on the calculation formulas of the distribution of the stresses.
本文在分析人工换填地基受力特点的基础上,对其应力分布的计算公式提出了新的建议。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条