1)  drainage of construction site
场地排水
2)  field
场地
1.
Analysis on signaling cable anti-interference against the field in substation;
变电站场地信号电缆抗干扰方法的分析
2.
After implementation the construction field is less, the hidden troubles reduced and a civilized and orderly project obtained.
论述了3200m3高炉工程场地施工特点及文明施工的管理内容和办法。
3.
Methods 90 hospitals were investigated by making a call to know the number, personnel, field and devices of the department of rehabilitation medicine in the hospitals of Shenzhen.
方法采用调查表通过走访的形式调查深圳市卫生系统90家医疗机构,了解康复医学科的设置、人员、场地和设备等情况。
3)  Site
场地
1.
Assessment Method of Site Selection for Land Treatment System of Municipal Wastewater;
城市生活污水土地处理场地勘察及适宜性评价方法
2.
A Conception Inspired by the Site The Design of the Ajina Park in Yijinhuoluoqi,Inner Mongolia;
从场地中构思 内蒙古伊金霍洛旗阿吉奈公园设计方案
3.
Analysis on Dynamic Slope-site-Structure Interaction;
边坡场地—结构动力相互作用分析
4)  court
场地
1.
The result reveals its correlation with the enrollment system, the teaching programm and teaching method, and the quality of the courts and facilities.
就体育教育专业学生运动损伤的原因、损伤分布特点、项目相关因素等进行调查,分析造成运动损伤的深层次原因及其与目前高校体育教育专业招生方法、教学计划、教学方法、场地设施建设等的关系。
2.
Through using the method of logical analysis,measurement,experiment and questionnaire,this paper makes study on national standard of basketball equipment and court of middle and primary schools.
采用逻辑分析、测量、实验与问卷调查法,对初中、小学篮球器材和场地规格的国家标准进行研究。
3.
The paper studies how the development of basketball courts promotes and affects the progress of basketball.
通过篮球场地的历史演变,对篮球运动发展的促进及影响进行探讨。
5)  ground
场地
1.
The application of GIS for ground anti-earthquake category judges;
GIS在场地抗震类别判定中的应用
2.
Processing method of prewatering self-weight collapsibility loess ground;
湿陷性黄土场地预浸水后的软基处理
3.
The influence of frozen earth layers and radiant damps of groundwork is considered and back-analysis is performed.
计算结果表明,在结构抗震设计时,应考虑季节的变化、地基辐射阻尼和场地区域地震动特性等因素的影响。
6)  Place
场地
1.
Whether the equipments and place fit the citizens health is the aim of the research.
全民健身计划的实施与体育场地的关系相当密切,平顶山地区的场地设施是否能与市区百姓的健康相适应是研究的目的所在,同时提出合理建议与方案。
参考词条
补充资料:矿山工业场地排水


矿山工业场地排水
drainage for mine industrial site

kuangshon gongye ehongdl Po.ShUI矿山工业场地排水(drainage for mine indus-trial Site)排除矿山工业场地内积水的方式和设施。使地表水迅速分散自流排出,或在低洼处设水泵排出,不使场地积水和被淹没,它是竖向设计的重要内容之一,对保证生产具有重要作用。 矿山工业场地排水有明沟排水、雨水管道排水和两者混合式排水等三种矿山工业场地一般多采用明沟排水,它具有造价低、便于清理等优点,但占地面积较大。为了使工业场地内的地表水顺畅流人沟内或雨水口,又不冲测地面,场地整平的最小坡度一般为4%。,困难时不宜小于2%。 明沟排水适用于台阶式布置的场地.工业场地中边沿处多粉尘易堵塞或雨水中夹带泥砂者的地段,以及埋设下水管较困难的岩石地段。 明沟有土沟、石砌沟、砖砌沟及混凝土沟等,断面形状可分梯形、矩形和三角形等,各类沟型断面尺寸见表:军叮井 雨水管道排水适用于地形比较平坦、面积较大、地下水位较高的场地;场地中建筑物、构筑物布置密集,且部分建筑物屋面采用内排水的地段,也可采用雨水管排水。雨水管排水可美化环境,保持场地清洁。 采用雨水管排水时,雨水口的设置应根据建筑物布置特点、暴雨强度、地形与地质条件及雨水口的泄水能力等因素决定。一个雨水口的泄水能力在20一soL/S之间,雨水口间的距离为3。一60m。 (汪应笃)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。