1) long-term sediment erosion/deposition
长周期泥沙冲淤
2) sediment scouring and silting
泥沙冲淤
1.
Mathematical model of sediment scouring and silting in Naodehai reservoir;
闹德海水库泥沙冲淤数学模型
2.
The flow and sediment variation in the upstream of the Yangtze river,the sediment scouring and silting in the channel of the middle Yangtze river and their response relation were analyzed.
对长江上游水沙变化、中游干流河道泥沙冲淤变化以及两者之间的响应关系进行了分析研究。
4) sediment erosion and deposition
泥沙冲淤
1.
The sediment erosion and deposition in the backwater region are influenced by both Danjiangkou Reservoir and the channel.
由于各年坝前最高及最低水位运用不同,因此,各年的回水变动范围也不固定,其泥沙冲淤的范围及强度也有所不同。
5) sediment erosion-accumulation
泥沙冲淤量
6) sediment and scour of reservoir
水库泥沙冲淤量
补充资料:水利工程水力冲淤
水利工程水力冲淤
hydraulic sluicing sediment of water project
shuili gongeheng shuili ehongyu水利工程水力冲淤(hydraulie sluieingsediment of water Projeet)利用水力减少或清除水库、河道、航道和水闸等水利工程设施受水流泥沙作用所产生的淤积的措施。水利工程产生淤积是水土流失和河流输沙受阻、流速降低的直接结果。泥沙淤积,使工程效益降低,甚至失去作用。在工程规划设计时,即应采取各种防沙、冲淤措施。工程投入运行使用后,作好防沙、冲淤处理:是工程管理的主要内容之一。泥沙,一方面对水流运动有抗拒性;另一方面受水流作用又有可动性。流速小时泥沙淤积,流速大时发生冲刷。因此,改变水流条件、增大流速,利用水流清除泥沙淤积,是处理泥沙淤积的经济有效途径。 水库水力冲淤①蓄清排浑。根据河流来水来沙不平衡的特点,多沙河流水库,可采用“蓄清排浑”的运用方式。非汛期来沙少,采取蓄清拦沙运用;汛期来沙多,降低库水位(或敞泄)排沙。使水库年内冲淤基本平衡,保持一定的兴利库容,长期使用,以发挥综合利用效益。黄河三门峡水库,初期蓄水拦沙运用,1960年9月到1964年10月.高程朋。米以下库区淤积严重,后加大泄洪设施,并改为蓄清排浑运用,水库年内冲淤基本平衡。②异重流排沙。水库蓄水期间,当洪水具有产生异重流的条件时,洪水入库后,细颗粒泥沙将以异重流形式潜入库底向坝前运动。及时开闸泄流,可将部分入库泥沙排出库外。异重流排沙效果与洪水流量、含沙量、粒径组成,泄量、开闸时间及库区地形等因素有关。汛期调洪时,要加强异重流观测。当异重流到达坝前时,及时开闸,并随时调整泄量,以提高异重流的排沙效果。异重流排沙能力有限,一般只能缓和水库淤积的速度.不能解决水库淤积问题。③泄空排沙。在水库泄空过程中,回水末端逐渐向坝前移动,因而原来淤积的泥沙,将因回水下移,恢复自然河道而产生冲刷。在泄空的最后阶段,应加大泄量,使库水位骤降,以增大冲刷效果。水库泄空排沙,通过两种方式进行,即变动回水区以下的沿程冲刷及三角洲前坡和顶坡的溯源冲刷。沿程冲刷可消除回水末端的淤积;溯源冲刷,逐渐向上游发展,为冲刷的继续发展创造条件。中小型水库泄空冲刷过程中,可以利用人工或机械将主槽两侧的泥沙推进主槽,或在主槽内进行人工或机械搅动,均可增大泄空冲刷的排沙效果。④中小型水库水力吸泥。利用水库上下游水位差,将库内淤积泥沙吸出,排出库外,是清除水库淤积的一种排沙措施吸泥装置,由操作船、吸泥管路及吸头三部分组成。操作船拖着吸头在泥面上移动。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条