说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 基坑施工监测
1)  monitoring of foundation excavation
基坑施工监测
2)  foundation pit construction
基坑施工
1.
The example analysis of soft soil foundation pit construction monitoring
软土基坑施工监测实例分析
2.
Numerical analysis of foundation pit construction to the architecture in the neibourhood
基坑施工对邻近建筑影响数值分析
3)  construction pit
施工基坑
4)  foundation pit monitoring
基坑监测
1.
Three calculating methods of horizontal displacement of foundation pit monitoring were summarized in this paper.
本文总结了基坑监测水平位移量的三种求解方法。
5)  excavation monitoring
基坑监测
6)  deep foundation pit construction
深基坑施工
1.
Analysis of effect of deep foundation pit construction in soft soil area on the surrounding buildings settlement;
软土地区深基坑施工对周边建筑物沉降影响分析
2.
Analysis and research of interaction between transportation infrastructure and deep foundation pit construction is a complex subject, it is very difficult solving the problem by the analytical method.
交通基础设施与深基坑施工的相互作用分析与研究是一个复杂的课题,完全采用解析法很难,采用平面应变分析,不能考虑时空效应。
3.
Finally,some ideas are presented about the affected area of the deep foundation pit construction in soft soil region.
深基坑施工会对临近已建建筑物造成一定程度的影响,尤其对使用年限很长,基础较差的砖木建筑。
补充资料:基坑施工降水


基坑施工降水
lowering of water level in foundation pit

  1 ikeng shigong iiongshui墓坑施工降水(lowering of wate:level infoundation pit)开挖基坑时,为防止地下水的渗入,确保基坑边坡的稳定,创造干燥和安全的施工环境,所采取的人工降低地下水位的措施。人工降低地下水位的主要目的是阻截土中潜流和降低自然水位。由于改变了地下水流方向,减少了对基坑的渗流破坏,从而保证了边坡的稳定,防止坑底隆起和产生流沙.根据土层渗水情况和所需降水深度,基坑降水可采用明渠法、井点法、管井法和辐射井法。 明渠法沿基坑挖出明渠,将水汇集到集水井内,再用序斗或泵等设备将水排出。在沙土中,明渠内可以填入沙砾建成盲沟,以防沙土淤塞沟渠。明渠法降水深度较浅,适用于沙土和粘性土中降水。如果沿荃坑坑壁分段设置明渠,则可以增大降水深度。 井点法用锤击、冲孔或钻孔方法沿墓坑周边作出深达含水层的孔洞,将配有滤水管头的井点管沉入含水层内或用射水法将带有球阀的井点管直接沉入含水层内。井点管与集水管道、抽水设备连接起来,组成井点系统。井点用水泵抽水时称为轻型井点,用真空泵抽水时称为真空井点,借助空气或高速水流的向上高速流动将水抽出时称为喷射井点。井点法适用于诊透一系数为。.05~lom/d的粘土和亚粘土.渗透系数为0.001~0.05m/d的粘土和亚粘土可采用电渗井点法降水。电渗井点法是以擂入土中的井点管作阴极,以插入土中的钢筋棒或铝棒作阳极,通过直流电后,由于直流电场作用,土中水分从阳极流向阴极,再从阴极井点笋一笋终匆…_
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条