说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 选址和定容
1)  siting and sizing
选址和定容
1.
A method for the siting and sizing of DG in the distribution network expansion planning is developed to optimize the site and size of DG with the genetic algorithm.
文中提出一种配电网扩展规划中进行分布式电源选址和定容的方法,应用遗传算法优化分布式电源的位置和容量。
2)  Optimal location and parameter setting
最优选址和定容
3)  locating and sizing
选址定容
1.
Distribution substation locating and sizing is a large-scale combination optimization problem,in order to solve the problem,this paper presents a new model of distribution substation locating and sizing.
变电站选址定容是一种大规模组合优化问题,为确定变电站的位置和容量,建立了一种变电站选址定容新模型。
4)  siting and sizing
选址定容
1.
A novel bi-level programming model for siting and sizing of distributed wind generation(DWG)under active management(AM)mode is put forward in this paper,which breaks the "fit and forget" installation policy of distributed generation in the passive distribution network.
提出主动管理模式下基于双层规划的分布式风电源选址定容规划模型,以分布式风电源的净收益期望值最大作为上层规划目标,以满足节点电压和支路潮流约束下风电源出力切除量期望值最小作为下层规划目标,考虑主动电压管理在改善节点电压和支路潮流方面的积极作用,提出模拟植物生长算法与概率最优潮流算法相结合的求解方法。
2.
A planning scheme based on the chance constrained programming for siting and sizing of distributed wind generation (DWG) in the existing distribution networks is proposed.
针对风电机组出力的间歇性、波动性,以及负荷变化的不确定性,应用机会约束规划建立了分布式风电源(distributed wind generation,DWG)接入现有配电网的选址定容规划模型,以独立发电商(independent power producer,IPP)收益最大为目标函数,采用随机潮流判断规划方案是否违反节点电压约束和支路功率传输约束。
5)  substation locating and sizing
变电站选址定容
1.
A new intelligent algorithm, refined multi-team particle swarm optimization algorithm (RMPSO), is presented to handle optimal substation locating and sizing problem.
提出了一种改进的多组织粒子群优化算法(RMPSO)来解决配电网络变电站选址定容问题。
2.
Optimal planning for substation locating and sizing is an important part of the power system planning which is between Load forecasting and network optimization.
变电站选址定容优化规划是电力系统规划工作中的重要环节,是衔接负荷预测和网络优化的中间部分,变电站的位置直接影响着未来电力系统的网络结构、馈线系统、供电质量和运行经济性,对整个配电网的建设有重大影响。
3.
The substation locating and sizing and the distribution network planning both are important and difficult of the power system planning.
变电站选址定容和配电网网架规划是配电网络规划中的重点和难点工作,对其进行优化规划可大大提高整体电网运行的可靠性、经济性和安全性。
6)  capacitated facility location problem (CFLP)
固定容量设备选址问题
补充资料:容和
1.谓曲意苟合以取容。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条