1) coal loading system
上煤系统
1.
Control of coal loading systems with bucket wheel reclaimers through video-based measurement of conveying flow;
基于视频传输流量检测的斗轮机上煤系统控制方法的研究
2) gas system
煤气系统
1.
Based on production management experience in the gas system,the related problems of nitrogen used in the gas system were analyzed,and in the light of production practice,the corresponding countermeasures were put forward.
结合从事煤气系统生产组织管理的经验,对在煤气系统中用氮的相关问题进行了分析,并根据生产实践,提出了相应的对策。
2.
Analysing the dynamic balance of the gas system at Chongqing Iron and Steel Company This paper gives the measures of optimizing dynamic balance to reduce gas loss of gas system by equipment revamping and linking gas production with power generatio
通过分析重钢煤气系统的动态平衡 ,探讨了利用大、中修改造设备 ,优化用气设施 ,将煤气产出与发电相结合 ,优化煤气系统的动态平衡 ,降低煤气放散的措施。
3.
Problems occurred in commissioning of gas-steam combination circulation generating unit(CCPP) and the problems had an effect on the whole gas system.
针对鞍钢燃气蒸汽联合循环发电机组(CCPP)在调试投产过程中出现的问题及对整个煤气系统的影响,采取一系列应对措施解决了问题。
3) Coal Distribution System
布煤系统
4) coal preparation system
选煤系统
1.
Putting into operation of the saving water type coal preparation system in dongtan coal washery;
东滩选煤厂节水型选煤系统的运转实施
5) coal injection system
喷煤系统
1.
The design of coal injection system of 1 580 m3 BF in Tangshan Medium Plate Co.
介绍了唐山中厚板有限公司炼铁1580m3高炉喷煤系统的设计。
2.
After systematic reformed the coal injection system has met the requirement of blast furnace of Cheng Steel.
喷煤系统经过系列改造,已经满足了承钢高炉要求的喷煤要求。
3.
Aiming at existent problems in original coal injection system,such as low productivity and high energy dissipation of the milling equipment,more equipment faults and mix PCI of bituminous and anthracile could not carry out,No.
济钢第一炼铁厂针对原喷煤系统存在的制粉设备产能低、耗能大,设备故障多,不能进行烟煤、无烟煤混喷等问题,采取了一系列优化改造措施:扩建煤场,实现了原煤储备量充足、给料快、达标;引进高产能中速磨煤机,并对其分离器结构和气流喷嘴的导流方式及收粉设备进行优化改造,保证了煤粉的产质量,消除了安全隐患;改用卧筒式烟气发生炉,确保系统压力、温度、流量符合混喷工艺要求;完善煤粉输送系统配置等,实现了煤粉的平稳均匀输送,实现了高炉高煤比喷煤。
6) coal handling system
输煤系统
1.
A new hydro-style turbulent contact scrubber and application for coal handling system in thermal power plant;
新型湿式湍流除尘器及在电厂输煤系统中的应用
2.
Influence of coal quality and type variations on coal handling systems;
煤质和煤种的变化对输煤系统的影响
3.
Application of new-style and high-efficiency electrostatic precipitators in coal handling system of thermal power plants;
新型高效静电除尘器在火力发电厂输煤系统中的应用
补充资料:输煤系统顺序控制
输煤系统顺序控制
coal handling system sequence control
shumel xltong shunxu kongzh-输煤系统顺序控制(eoal handling systemsequence control)对进厂煤送锅炉房或储煤场以及储煤场的煤送锅炉房进行的自动控制.送锅炉房的煤根据各台锅炉原煤斗的煤位或煤量悄况分别送人各台锅炉的原煤斗。当所有煤斗均有充足的煤t时,进厂煤应转送往储煤场。皮带运输机的正常起停过程都是按照顺煤流方向进行的,即先起动卸煤沟底的给煤机和1号皮带运愉机,待1号皮带运箱机上的煤流接近皮带的终端时,再起动2号皮带运翰机。停止时应先停止给煤机,待l号皮带运翰机上的煤已卸空时再停止1号皮带运输机。在事故情况下,允许同时停止所有的皮带运输机。斗轮堆取料机的控制是由储煤场的一端开始使斗轮机的悬臂作旋转运动。待煤场形成一条弧形的煤堆后再控制斗轮机前进或后退,并使悬份反向作旋转运动。如此不断反复控制,直到斗轮机到达储煤场的另一端,并使煤场上堆好第一层煤。用同样的方法控制斗轮机在煤场上堆第二层、第三层煤,直到全部煤堆完为止。而取煤的方式和堆煤相反,先取最上一层煤、再依次取以下各层的煤。 现代大容量火电厂的输煤系统控制采用可编程逻样控制器,具有设备起停,运行路径检查、选择,条件连锁逻辑处理,运行工况监视、报普、保护,卸煤给煤机调节,来煤计量,料位测量,原煤斗配煤等功能,可以程控、远控或就地操作。为此,还必须配备以下专用测量变送器:①皮带速度变送器,当皮带的速度低于额定值的90%时送出报警信号,而低于75%时送出停止皮带箱送机的信号;②煤流开关,装在皮带的头部及尾部,当煤流量达到额定值的20%~40%时,送出有煤流的信号用以控制皮带运输机的起停;③煤斗煤位或煤量变送器,在煤斗煤位或煤量低于10环时送出空仓信号,超过90%时送出满仓信号用以控制输煤系统的起停;④皮带偏移开关,当皮带中心线偏离运翰机中心线超过皮带宽度的5%时,送出皮带偏移信号控制皮带运输机;⑤落煤管堵煤信号,在落煤管发生堵塞时送出信号起动振动器或停止皮带运输机;⑥金属探测器,探测到磁性金属时,控制电磁铁进行排除,探侧到非磁性金属时,控制含杂物的煤分流排除;⑦角位移变送器,测量斗轮堆取料机悬臂的水平和垂直位置,用以控制堆取料机的堆煤和取煤过程。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条