1) maximal unbalanced force
最大不平衡力
1.
We obtained the rule of the displacement distribution under the condition of excavation and soil nail supporting,at the same time we put forward the best time of the soil nail supporting according to the change of the maximal unbalanced force.
本文采用FLAC软件,通过建筑物基坑随开挖深度增加而变形的模拟,得出基坑每一阶段开挖及土钉支护条件下的位移发展演变规律,跟踪最大不平衡力变量的变化提出了最佳土钉支护时机。
2) maximum unbalance rate
最大不平衡率
1.
The maximum unbalance rate of the system in the most unfavorable circuit is obtained under the regime of standard heat-supply (95/70 ℃).
研究了下供下回异程式分户计量供暖立管系统最不利环路间允许的最大不平衡率,建立了压力不平衡率、水力失调度与室内温度波动三者之间的数学关系,得到了在标准供热工况(95/70℃)下,系统最不利环路间允许的最大不平衡率,给出了计算结果与分析。
3) maximum permissible unbalance
最大容许不平衡
4) maximum equilibrium stress
最大平衡应力
5) large unbalance
大不平衡
1.
Limitation of large unbalance nonlinear vibration numerical calculation answer is discussed.
讨论理论分析大不平衡非线性振动响应的局限性,指出大不平衡总是伴随着动静碰摩的发生。
6) unbalance force
不平衡力
1.
Through combining the actual condition of the piping layout of offshore platform and calculating the unbalance force caused by pulse,it confirms the method is the best.
并以海上已投产平台为例进行振动分析,计算了因脉动引起管道振动的不平衡力。
2.
Unbalance forces of the engine is the main reason for vibration of motorcycles.
发动机不平衡力输出是引起摩托车振动的直接原因,对发动机不平衡力的研究是对整车振动研究的基础。
补充资料:最大的最大收益值准则
分子式:
CAS号:
性质: 也称最大的最大收益值准则。不确定型决策准则之一。其方法是:首先找出各方案的最大收益值,然后选择这些最大收益值中最大者所在的方案作为最满意方案。这个准则采取乐观主义态度,把方案最大收益值(或最小损失值)的自然状态,作为必然出现的自然状态采看待,从而把不确定型决策问题化为确定性决策问题来处理。选择最大收益值中最大的方案(对损失值来说就是选择最小损失值中最小的方案)作为最满意的方案,即取“最有利中之最有利”方案,所以亦称为“乐观的决策准则”。
CAS号:
性质: 也称最大的最大收益值准则。不确定型决策准则之一。其方法是:首先找出各方案的最大收益值,然后选择这些最大收益值中最大者所在的方案作为最满意方案。这个准则采取乐观主义态度,把方案最大收益值(或最小损失值)的自然状态,作为必然出现的自然状态采看待,从而把不确定型决策问题化为确定性决策问题来处理。选择最大收益值中最大的方案(对损失值来说就是选择最小损失值中最小的方案)作为最满意的方案,即取“最有利中之最有利”方案,所以亦称为“乐观的决策准则”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条