2) power transforming and distribution
变电配电
3) transformer substation
变配电所
1.
First, the paper gives an introduction about the development of direct current power supply system in railway transformer substation.
介绍了铁路变配电所直流电源系统的发展,对组成系统的主要部件即蓄电池、充电浮充电机及控制系统进行了分析,阐述了直流电源系统选择的实质及容量的确定,建议一般铁路变配电所宜选用带镉镍蓄电池或免维护全密封铅酸蓄电池的自控型直流电源成套装置,建议将建立"三遥"(遥控、遥测、遥信)电力系统的变配电所直流电源系统选用全自动智能型带有"三遥"接口的直流电源屏。
2.
Summary: Current change to go together with the extension that transformer substation with set up transformer substation start construction to have a dissimilarity,demand the side circulate side construction,install difficulty big,the safe problem is outstanding and adjust to try process complications.
既有变配电所改扩建与新建变配电所施工有所不同,需要边运行边施工,安装难度大、安全问题突出、调试过程复杂。
4) distribution substation
变配电站
1.
Discussion about design on secondary circuit of distribution substation AC operation;
变配电站交流操作二次电路设计有关问题探讨
5) substation and distribution station
变配电所
1.
This article introduces the technical features of design of power supply and distribution for Ningbo resi- dential engineering and presents a de- tailed analysis of the load statistics and computation in Ningbo residential engineering,configuration of substation and distribution station of a quarter,and power distribution requirements for in- door and outdoor engineering.
文章介绍了宁波市住宅工程供配电设计的技术特点,具体分析了宁波市住宅工程中的负荷统计和计算、小区变配电所的配置、户内外工程的配电要求。
2.
Starting from the status of the power test in Chinese railway, illustrates the purpose of establishing the automatic inspection system of substation and distribution station in two aspects of automatic inspection and data management, introduces the components, functions, the key techniques, main features and detailed application in power test.
从目前路内电力试验的现状入手,阐述了建立变配电所电力试验自动检测管理系统的目的,从自动检测和数据管理2个方面详细介绍了该系统的构成、功能、采用的关键技术、主要特点及在电力试验中的具体应用情况。
6) transformer and distribution system
变配电
1.
According to the current situation of research, operation and design of telecommunication power supply, this paper aims to arouse the attention of the industry people to such issues as enhancing and improving the reliability of transformer and distribution system, restructuring and re-evaluating power supply system, and looking at the tiny details of the operation of power supply system.
本文根据通信电源研究、运行和设计的现状,提出了加强和完善变配电系统的可靠性,进行电源系统的优化配置和重新评估,关注电源系统运行的“细枝末节”等几点意见,以期引起业内人士的重视。
补充资料:农村配电变压器台(室)
农村配电变压器台(室)
rural distribution substation
nongCun Peld,anb一anyaqlto.(sh一)农村配电变压器台(室)(rural distributionsubstation)由10 kv/0.38 kv配电变压器、高低压配电设备及附属建筑物构成的农村电力网中最末一级变配电设施,35 kV/0,38 kV农村配电变压器台又称直配变台。其功能是把中压(1。kV)或高压(35kV)变为可供用户直接使用的低压,并对低压配电线路实行保护和控制,一般建在负荷中心附近。 中国农村配电变压器台(室)将逐步实现标准化,淘汰高能耗配电变压器等设备,采用适合农村负荷及环境特点的新装备。例如,农村专用低压配电箱、成套式配电装t、全户外成套式变台、低铁损节能型配电变压器等。采用进口及国产非晶合金铁芯制成的低铁损配电变压器已分别于1990年在甘肃天水、1991年在河北琢州市农网投人运行,情况良好,在解决造价离的问题后有推广前景.20世纪末,节能效果较好的511型卷铁芯配电变压器已引起人们的重视。 构成农村配电变压器台(室)由配电变压器、高压配电设备、低压配电设备和附属建筑物等四部分构成。 (l)配电变压器的功能是传送电能和降低电压.通常选用1台变压器,少数企业或县城变电室选用2台及以上配电变压器。配电变压器容量考虑五年期的负荷发展。(2)高压配电设备有避雷器和高压开关电器。前者的功能是防雷保护,后者的功能是对配电变压器运行进行保护和控制。当配电变压器容量在560 kv·A以下时,高压开关电器一般采用高压跌落式熔断器对配电变压器内部短路进行保护.也可以选用熔断器和负荷开关进行保护。当配电变压器容量大于560 kV·A时,高压侧一般用高压断路器和隔离开关进行保护。 (3)低压配电设备主要有配电箱、计量装置、漏电总保护器和低压避雷器。其功能分别为对变压器及出线的运行进行保护、控制与监测,计量电能和对配电变压器进行防雷保护。配电箱内装有电压表、电流表(有时加装有功功率表、无功功率表)、进线总保护开关电器和各条出线回路的开关电器。315 kV·A及以下配电变压器一般可用低压熔断器和隔离刀闸作为总保护,容量超过315 kV·A的选用低压断路器保护。低压侧总保护具有过负荷和过流保护功能。当采用熔断器保护时,熔体额定电流按变压器允许过负荷倍数和熔体的熔断特性确定。当采用低压断路器时,过负荷保护为延时动作,动作电流根据变压器低压侧允许过负荷电流确定;过流保护为瞬时动作,动作电流为变压器低压侧额定电流的6~8倍。各出线回路的保护动作应与总保护相配合,保证保护动作的选择性。计量装置为电能表箱,有时加装防窃电的设施。在雷电活动频繁的地区,低压侧加防雷设备。