1) transient semi-value method
暂态半值法
2) transient rating
暂态定值
1.
Taking Yunnan-Guangdong ±800 kV UHVDC transmission project as an example, the paper verifies the resonance of DC side and calculates the transient ratings of DC filter components, showing that the design of DC filter of the project is reasonable, and it can meet the requirement of the project operating safely.
以云广±800kV特高压直流输电工程为例,对直流侧谐振进行了校核,对直流滤波器设备暂态定值进行了计算。
3) first half transient wave
暂态首半波
1.
Since the success rate of faulty line selection based on single criterion for single-phase earthing fault in non-solidly earthed network is normally low,a new comprehensive faulty line selection equipment is proposed which based on the first half transient wave and active component direction of zero-sequence current.
为解决小电流接地系统发生单相接地故障后,单相判据的小电流单相接地故障选线成功率普遍较低的问题,提出一种基于暂态首半波和零序电流有功分量方向的综合选线装置。
4) transient arithmetic
暂态算法
1.
On the basis of analysing the main reasons that cause the difficulties of fault line selection on indirectly grounding power system, the paper brings forward a new design of fault line selection device that focuses on transient arithmetic.
该装置采用TMS320VC5402DSP为CPU,很好地满足了暂态算法对硬件的要求,实验表明本装置具有很好的应用价值。
2.
The paper is based on amending the software arithmetic, and introduces a novel transient arithmetic, and integrates all fault detection method by membership function.
本论文从改善软件算法出发,引入暂态算法等新的判据,通过隶属函数构造成多种判据参与选线,进行智能融合,把保护智能化的思想引入小电流故障选线中来。
5) the maximum of zero sequence transient current
暂态极大值
1.
A new criterion for fault line selection in non-solidly earthed network based on the maximum of zero sequence transient current is proposed.
根据小波变换后的近似系数以及其提供的时域信息,提出了一种基于零序电流暂态极大值的小电流接地故障选线新判据,该判据不受故障初相角、过渡电阻及中性生点接地方式的影响。
6) transient energy method
暂态能量法
补充资料:变电所快速暂态电磁场
变电所快速暂态电磁场
fast transient electro-magnetic fields in substations
变电所中快速暂态电磁场强度由于开关操作暂态过程受多种因素影响.因此变电所中实际测t得到的场强数值分散性较大。不同电压等级变电所,用不同型式开关,实测得到的电场强度可达数十千伏/米(kV/m).磁场强度可达数百安培/米(A/m).美国对变电所中操作暂态电磁场的实测工作做的较多。作为一个例子,下表列出了美国电力研究院(EPRI)在115kV、250 kV、500 kV变电所中的实测结果。常规变电所内测点在母线下方地面,操作是断开一段短母线,一川纵潮洲娜朋洲川一0 0 0 0 0 00411:1l)即10 010加 ︵任守︸侧欲典匆 6 .0臼.《】火l()《a)T(5、留一。·““nlj 0 50几00 .,0.1 10 (任/A艺侧蔽2.()魂.硬)丫﹂)()口匕t卜卜片卜f乙仁0 t 0 0 0 0 005 .....-卜闭40加020化 (‘/V)侧旧要翻,::.:: l二‘.1.吐吐.吐2.《)4.(】6 .0划) 了卜卜┌────┬──────┐│ 一一J │八L,‘一’ ││习 ├──────┤│一一.1 │{犷V一· │└────┴──────┘0﹃-j门1 96,JD.任1 9 tl滩n乙oq乙 ︵三z淤巴侧翻要御 (一。一‘)洲.‘}12‘)一6(,义1‘,一‘, 喊d)T(5) 500 kV变电所内断开隔离开关时 的地面电场和磁场(a)GIS磁场;(b)GIS电场;(e)AIS滋场;(d)AIS电场b一and一onsuo kuolsu zonto一d一onelehong变电所快速暂态电磁场(fast transient elec-tromagnetie fields in substations)变电所中隔离开关切、合短母线时的暂态过程产生的电磁场。高压隔离开关操作时,触头间产生一系列电弧过程。