1) transmission of shunting trip plan
钩计划传输
2) shunting trip Plan
钩计划
1.
Shunting trip plan transmission, control and printing system,which mainly realizes shunting trip planning and relevant data transmission between heterogeneous networks,is one key part of integrated automation system at marshalling station.
钩计划传输打印控制系统是编组站综合自动化系统的一个重要组成部分,其主要功能是实现钩计划及相关信息在异型网络上的传输。
2.
The core functions of intelligent commanding system for shunting work refer to those essential and key functions that the system should possess, mainly including 3 parts: the generation of shunting trip plan, the optimization of work, and the smoothing function that represents the adjustability of commanding and the adaptability of system.
调车作业智能化指挥系统的核心功能是指系统应具备的本质性关键功能,主要包括钩计划编制功能、作业优化功能,以及体现指挥可调性和系统适应性的柔化功能3个部分。
3.
Through an analysis to the process of station shunting operation,based on existing theory of shunting trip plan producing, the paper analyzes andstudies the shunting trip plan producing with different sidings.
通过对车站调车作业过程的分析,在既有调车钩计划编制理论的基础上,对可使用股道数量不同情况下的调车方案的编制进行分析研究,设计出能够自动编制调车钩计划的智能化计算机算法,为最终编制自动输出钩计划的计算机程序奠定了基础。
3) cut plan
钩计划
1.
the principles for making cut plan of the train forming are systematically expounded and its realization method by computer is also discussed in this paper.
系统地论述了成组选编、混合选编的适用条件及其调车作业钩计划编制原理和计算机实现方法。
2.
is designed for making the cut plan of forming pick - up and distribution trains.
并从确定待编车列中各到站定位车组的位置入手,探讨了计算机编制摘挂列车编组钩计划时车组下落及确定可调车组的方法。
4) shunting operation plan
调车钩计划
1.
In this paper,the quantitative criterion for evaluating the schemes of shunting operation plan is put forward, the conception of the combined scheme is deduced according to the comprehensive analysis to the set of the shunting operation plan schemes, and the analysis and calculation method is discussed at length for computer optimizing the shunting operation plan schemes.
提出了摘挂列车编组调车钩计划评价的量化标准,在对调车方案进行整体分析的基础上引出了变异方案的概念,论述了利用计算机筛选和优化调车方案的分析计算法。
5) offtake program
分输计划
6) transportation plan
运输计划
1.
By investigating in the transportation department of PetroChina,we give the direct matrix of transportation,then analyze its role in the decision making of transportation plan.
本文通过对中国石油天然气股份有限公司的调查,在分析总结计划人员制定运输计划的经验和规则的基础上,提出了流向矩阵的概念,进而分析其在制定运输计划时的作用,然后建立了在优化运输费用的基础上进—步优化运输时间的双层运输问题的模型,并给出了求解该模型的算法。
补充资料:钩钩
1.形容鼾声。 2.形容物体的弯曲。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条