说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 电务调度
1)  S&C dispatch
电务调度
1.
It is described in the paper to establish working system for S&C dispatch, play the commanding and coordinating role of S&C dispatch in emergency handling of equipment failures so as to recover the failure equipment in the shortest time and minimize the resulting interference to railway transportation.
制定电务调度工作制度,发挥电务调度在设备故障应急处理中的指挥协调作用,以最短的时间恢复故障设备,减少对铁路运输干扰。
2)  power dispatching business
电力调度业务
3)  task scheduling
任务调度
1.
Application of priority-based task scheduling in the data exchange platform;
基于优先级的任务调度模型在数据交换平台中的应用
2.
Battery-aware task scheduling algorithm on DVS enabled processors;
针对变电压处理器的电池感知任务调度算法
3.
Parallel task scheduling strategy with multi-objective constraints in P2P;
对等网络环境下多目标约束的并行任务调度策略研究
4)  tasks scheduling
任务调度
1.
Design and implementation of observation satellites tasks scheduling system;
多观测卫星任务调度系统的设计与实现
2.
Grid tasks scheduling strategy based on degree of multi-objective conflict
基于多目标冲突度网格任务调度策略
3.
A proper algorithm for tasks scheduling based on features of parallel system on multi-core processor is proposed.
针对多核处理器并行系统的特点,提出了相应的任务调度算法,该算法在任务调度之前加入了任务分配技术,通过合理的任务分配,可有效减少多个处理器间的通信开销,使任务调度效率更佳。
5)  scheduling service
调度服务
1.
Simulation study on performance of different scheduling services in IEEE 802.16e protocol;
IEEE 802.16e协议调度服务性能模拟研究
2.
The Research of Real-Time CORBA and The Analysis and Improvement of Real-Time Scheduling Service;
实时CORBA研究及实时调度服务分析改进
3.
Each connection is associated with a single scheduling service.
16e建议的三种实时调度服务算法:UGS、rtPS、ertPS,并在此基础上提出了一种优化的实时调度服务算法:irtPS。
6)  job scheduling
任务调度
1.
Fault-tolerant grid job scheduling based on dynamic replication;
基于动态备份的容错网格任务调度
2.
New grid job scheduling algorithm based on trust-driven;
基于信任驱动的网格任务调度新算法
3.
Adaptive and dynamic grid job scheduling algorithm;
一种自适应的动态网格任务调度算法
补充资料:厂用电受电


厂用电受电
energizing of auxiliary power system

chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条