2) Standards for Geological Exploration of Dyke Project
堤防工程地质勘察规程
1.
The concept of dyke body and dyke base is mixed up due to the formulation of dyke body in Standards for Geological Exploration of Dyke Project and causes some confusion in the current geologic exploration of dyke project.
《堤防工程地质勘察规程》对“堤身”的提法已混淆了“堤身”与“堤基”的概念 ,并在当前堤防工程地质勘察中造成了一定混乱。
3) geotechnical investigation code
勘察规范
1.
The caustic alkali corrosion stated in the geotechnical investigation code is different from the commonly said caustic alkali-aggregate reaction corrosion, the latter belongs to the corrosion formed from the overproof of caustic alkali in the concrete aggregate, and unrelated to the investigation work.
勘察规范中苛性碱腐蚀与通常所说的苛性碱—集料反应腐蚀是不同的 ,后者是混凝土集料中苛性碱超标构成的腐蚀 ,与勘察无关。
4) exploration plan
勘察规划
1.
The exploration plan of Quaternary underground reservoirs is made which divides the province into five underground reservoir exploration areas: completion area,near-future area,mid-term area,long-term area and unplanned area.
通过分析辽宁省水资源的供需现状、基础地质气候条件以及重点对第四系河谷的野外实地调查,同时根据地方经济的发展趋势、地下水库的功能,论证了辽宁省地下水库开发的必要性和可行性,指出该省的下辽河平原、辽西部分山间河谷、辽西辽南的滨海河谷适宜修建地下水库,并制定了第四系地下水库勘察规划,即把辽宁省规划为5个地下水库勘察区(地下水库已勘察区或建成区、近期地下水库勘察区、中期地下水库勘察区、远期地下水库勘察区、未规划地下水库勘察区)。
5) Code for Investigation of Geotechnical Engineering
岩土工程勘察规范
1.
Problems in Application of CPT with "Code for Investigation of Geotechnical Engineering";
《岩土工程勘察规范》中的静力触探问题
补充资料:板带轧制速度规程(见板带轧制规程设计)
板带轧制速度规程(见板带轧制规程设计)
speed schedule for plate and strip rolling
bandai zhazhi sudu guieheng板带轧制速度规程(speed seheduxe fo:plateand strip rolling)见板带札制规程设计。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条