1) power-driven Luoyang pipe
机动洛阳铲
1.
The technical squeezeing-spreading tray pile by power-driven Luoyang pipe;
机动洛阳铲成孔挤扩支盘桩施工技术
2) Making better power-driven Luoyang shovel short piel
改进型机动洛阳铲短桩
3) Luoyang shovel
洛阳铲
1.
Construction technology of tamped cement soil pile foundation with pore-forming by Luoyang shovel;
洛阳铲成孔夯实水泥土桩地基处理施工技术
2.
10 line Xueyuan Road Xiaoyuehe Bridge pile reinforced project of Beijing subway,it discusses the constructing points and main parameters of artificial digging pile,Luoyang shovel-exploring skill and floor drilling pouring reinforced bridge pile.
以北京地铁十号线学院路站小月河桥桩加固工程为背景,论述了人工挖孔桩和洛阳铲探测管线技术、地面钻孔注浆加固桥桩的施工要点及主要参数,对类似工程有一定的参考价值。
4) method of Luoyang shovel hole form-ing
洛阳铲成孔法
5) Luoyang airport
洛阳机场
1.
To prevent and control bird strike disaster,this study investigated the bird distribution around the Luoyang airport;the results showed that there are 6 species Oriental species,accounting for 13.
为了预防和控制洛阳机场鸟撞事故,保证飞行安全,采用样线法对洛阳机场及周边地区的鸟类进行了为期12个月的调查。
6) power-drag scraper
机动拖铲
补充资料:洛阳铲
1.一名探铲。用以探查地下古物。根据铲头所带的泥土,可以推断地下堆积的情况。该铲为旧时洛阳盗墓者所造,故名。现为考古工作者常用的一种工具。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条