您的位置:首页 -> 词典 -> 桩顶沉降
1)  Pile top settlement
桩顶沉降
2)  pile head settlement
桩顶沉降量
3)  pile top load versus settlement curves
桩顶荷载-桩顶沉降曲线
1.
Based on field loading test pile data in three engineering sites,it had a fitting analysis on the pile top load versus settlement curves(Q-S curves) and had a bearing capacity calculation of thin-wall cast-in-situ tubular piles.
基于3个场地共13根桩的现场试验资料,对现浇混凝土薄壁筒桩进行了桩顶荷载-桩顶沉降曲线的数学拟合和承载力计算。
4)  pile load-settlement curve
桩顶荷载-沉降关系
1.
In this paper, the three parameters load transfer function of pile skin and bottom is recommended, and the iterative arithmetic to compute pile load-settlement curve is given.
 介绍了桩身和桩端的三参数荷载传递函数模型,推导了桩顶荷载-沉降关系P-S曲线的迭代算法,讨论了荷载传递函数模型中各参数对桩顶荷载-沉降关系曲线的影响;采用该文所推导的桩顶荷载-沉降关系P-S曲线的迭代算法,计算了南京两个实际工程中的两根大直径桩的桩顶荷载-沉降关系曲线,计算的曲线与静载试验得到的曲线吻合很好。
5)  settlement of pile group
群桩沉降
6)  settlement of single piles
单桩沉降
1.
An Analysis of settlement of single piles in cohesive soils;
粘性土中大直径钻孔灌注桩单桩沉降分析