说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 快速施工管理
1)  rapid construction management
快速施工管理
2)  fast construction
快速施工
1.
Study on fast construction technology of Dahuashui RCC High-thin Arch Dam;
大花水碾压混凝土高薄拱坝快速施工技术研究
2.
Study on Fast Construction Technology for Moxi NO.2 Tunnel;
磨溪二号铁路隧道快速施工技术研究
3.
Research on Fast Construction and Numerical Simulation of Settlement for High Embankment;
高填路堤快速施工及沉降的数值仿真研究
3)  rapid construction
快速施工
1.
Study on potential probing system for rapid construction of vertical shaft;
立井井筒快速施工挖潜的系统研究
2.
Analysis of the mechanical effect on rapid construction of super-long soft surrounding rock tunnel with high water content;
特长富水软弱围岩隧道快速施工力学效应
4)  quick construction
快速施工
1.
Concrete quick construction for shifting the temporary ship-lock to silt sluice in the Three Gorges Project;
三峡临时船闸改建冲沙闸项目混凝土快速施工
2.
Futhermore,the experiences of quick construction of tunnel are accumulated.
在台缙高速公路长石隧道工程施工中,根据不同围岩的地质条件,采用较经济可行的施工方法和技术措施,积累了隧道快速施工的经验。
3.
Introduce quick construction technology of reinforced concrete oblong assembly culvert following “protecting permafrost soil” principle—winter construction.
介绍多年冻土区拼装式钢筋混凝土矩形涵洞快速施工技术,按照保护多年冻土的原则,选择寒季施工。
5)  speedy construction
快速施工
1.
Some other construction performances and experiences are introduced and an efficienty way of reaching a high quality and speedy construction in the baserock section of the vertical shafts are also discassed.
本文对其施工方法和施工经验进行介绍,并探讨了立井基岩段实现优质高效、快速施工的有效途径,为立井基岩段快速施工提供了依据。
2.
The speedy construction with borehole, longhole drilling and blasting method at the freezing baserock section in №2 mine of Xuandong has been introduced.
介绍了宣东二矿主井井筒冻结段快速施工方面的经验。
6)  high-speed construction
快速施工
1.
It simply introduces the concept of high filling embankment,combining with engineering practice,synthetically considers high-speed construction of high filling embankment from some factors,disposal of natural foundation,padding,compaction,add-tendon soil,pouring starch to make up for better,in order to meet foundation engineering quality and demand of project time.
简要介绍了高填方路堤的概念,结合工程实际,从天然地基处理、填料、普通压实、强夯补压、加筋土、注浆补强等各方面,综合考虑高填方路堤快速施工,以满足路基工程质量与工期要求。
2.
According to the engineering features, the key to organize a high-speed construction is to choose an appropriate scheme.
根据工程特点,选择合理的施工方案是组织快速施工的关键。
3.
It implemented continuous high-quality and high-speed construction of vertical shaft.
2m,实现了立井井筒连续优质快速施工。
补充资料:建筑施工管理
      建筑安装企业从承担任务开始到工程交工验收全过程的管理工作。其目的是按照建筑施工自身的技术经济规律,运用计划、组织、指挥、控制、核算和监督等职能,将全部施工活动,在时间和空间上科学地组织起来,投入最少的人力、物力、财力,使建筑工程工期短、质量好、工效高、成本低,满足使用功能要求,以便最大限度地发挥投资效果。施工管理包括计划、经济、技术、质量、安全、材料、机具、劳动力等业务管理和现场管理。其中正确编制和贯彻施工组织设计是各项施工管理工作的依据和核心。施工组织设计是指导施工全过程的技术经济文件,一切施工活动都应据此进行。
  
  建筑安装企业的施工管理要体现生产指挥的高度集中和企业管理的广泛民主。根据建筑施工的特点,在管理上还必须掌握好主导工序施工的连续均衡和各类人员的合理比例与材料、机具的配套供应。中国正在逐步采用现代化管理科学方法,如"全面质量管理"、网络计划技术等;电子计算技术也在施工计划、预算、数据存储等方面得到应用。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条