说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 堤头
1)  bank-head [英]['bæŋk,hed]  [美]['bæŋk,hɛd]
堤头
1.
To determine the bank-head s ice force of the lead-navigating bank at key position that faces the ice directly of certain water conservancy, ice model test in reduced scale is designed and carried out based on the local situation on the spot and data observed.
以现场实际工况及观测数据为依据,以确定某水利枢纽关键迎冰部位引航导堤堤头冰荷载问题为目的, 设计并进行了缩尺的冰模拟试验。
2)  head of breakwater
防波堤堤头
3)  mole head
突堤堤头;防波堤头
4)  abutment embankment
桥头路堤
1.
Based on the results from Boussinesq s Equation and the theory of differential and integral calculus and limitation, the formula is derived to calculate the additional stress on the foundation under the load from abutment embankment, with detailed studies on the laws for distribution and variation of such stress.
在布辛奈斯克解的基础上 ,应用微积分和极限的方法[1] ,推导出桥头路堤荷载作用下的地基附加应力的计算公式 ,并对桥头路堤应力的分布规律与变化规律进行了较为详细的讨论与研究。
5)  closure dyke end slump
堤头坍塌
1.
The analysis predicts the closure dyke end slump length and volume for different dumped material sizes, slopes and flows.
为了掌握堤头坍塌规律并指导三峡工程大江截流的实施 ,在给出深水截流堤头坍塌计算式组的基础上 ,针对三峡大江深水截流进行了堤头坍塌计算 ,求出了在不同抛投料粒径、不同稳定坡度和不同流量条件下的堤头坍塌长度和体积 ,并点绘成图以便在实施过程中进行坍塌预报。
6)  head of the filling dike
进占堤头
1.
Off-stability conditions at head of the filling dike are put forward according to factors which may lead to slump of the head dike and applications of the above-mentioned conditions are also introduced.
三峡工程大江截流的主要特点是水深大、流量大截流过程中的关键技术难题是由截流戗堤坍塌所引起的安全问题从截流戗堤堤头坍塌的主要引发因素入手,提出了进占堤头失稳的条件,并对这些条件的运用进行了叙述
补充资料:天津市东堤头中学

天津市东堤头中学

【概况】东堤头中学位于北辰区西堤头镇西堤头村村东侧,始建于1968年。该校是一所国办初级中学。占地29760平方米,一幢教学楼,23个教学班,建筑面积2600平方米,体育运动场12700平方米。现有15个教室,在校生695人,现有教职工58人,其中中学高级教师队10人,中级教师24人,初级教师23人,工人1人,任课教师47人,其中具有本科以上学历的17人,专科学历33人。该校1999年荣获育人环境特色校、2000年镇级先进党支部、2001~2002年荣获优秀家长学校、1999~2002年连续三年被评为初中毕业班先进单位,2001~2002年荣获区级、市级文明单位等荣誉称号。现任校长张振华。历任校长有苏宏彧、周树华。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条