1) scheme of configuration scale
配置规模方案
2) allocation scheme
配置方案
1.
Aiming at electric metering error caused by the difference between rated secondary load and actual secondary operating load of high voltages metering box voltage transformer,through simulating different load,the influence of secondary circuit load on metering error are analyzed,and the reasonable load allocation scheme are putted forward.
针对高压计量箱内电压互感器在实际二次负荷与额定二次负荷不同时引起电能计量误差的问题,通过模拟不同的二次负荷,分析了电压互感器二次负荷对计量误差的影响,并据此提出合理的负荷配置方案。
2.
A new distributed allocation scheme of voltage transfo rm er is submitted, through which normal schemes are analyzed for 220 kV voltage tr a nsformer of 500,220 kV substations.
对目前国内 5 0 0、2 2 0 k V变电所 2 2 0 k V侧电压互感器常规配置方案及存在问题进行了分析总结 ,提出一种新的电压互感器分散配置方案。
3) configuration scheme
配置方案
1.
By use of power system analysis software Power World the power flow of a certain regional power network is simulated; from this the nodes and zones with weak voltage stability are found out, and an optimal configuration scheme of phasor measurement units (PMUs) in this regional power network is proposed.
运用电力系统分析软件Power World对某区域电网的潮流进行了仿真计算,找出了该区域电网中电压稳定性较弱的节点与区域,给出了相量测量单元(phasor measurement unit,PMU)的优化配置方案。
2.
Technical and economic analyses of 1 000 MW USC unit once-through seawater supply system circulating water pump configuration schemes,including 1 unit with 2 pumps(extended unit scheme) and 1 unit with 3 pumps(unit scheme),are performed.
对1 000 MW超超临界机组海水直流供水系统循环水泵按1机2泵(扩大单元制)和1机3泵(单元制)配置方案进行了技术经济分析,从循环水系统初期投资、运行灵活性、检修维护方便和年运行费用等方面综合考虑,1机3泵配置方案优于1机2泵配置方案。
3.
According to the principles of strengthening the main protection and simplifying the backup protection, a new protection configuration scheme of interconnecting transformer in 500 kV system is put forward.
对目前500kV系统联络变压器保护配置方案在保护范围、后备保护的配合关系及运行方式的灵活性等方面进行了分析。
4) disposition scheme
配置方案
1.
The analysis of the disposition scheme of Mine Discharge Pump by using of reliability;
井下排水系统配置方案可靠度分析
2.
Based on the introduction to the types and applications of large gas turbines and gas steam combined cycle power generating units,a specific approach is made to the disposition schemes of combined cycle units.
介绍了大型燃气轮机和燃气蒸汽联合循环机组的类型及其应用情况, 重点对联合循环机组的配置方案进行了探讨。
5) configuration
[英][kən,fɪɡə'reɪʃn] [美][kən'fɪgjə'reʃən]
配置方案
1.
Based on one kind of CCHP applied in a building,related to the aspects of the fuel energy saving ratio(FESR) and economy,the different configurations of generate power were compared,also the operational strategies of PowerFollowing(PF) and Full-Load(FL) were discussed.
针对一种应用于楼宇的冷热电联产系统(CCHP),从一次能源节约率(FESR)和经济性出发,对不同的发电功率配置方案进行对比,并考查“用户负荷跟随”和“全负荷”两种运行策略。
2.
Principle of the SAW Gyroscope and the matrix of output voltage were introduced,Fundamental structure of the inertial navigation system based on SAW was researched,and the configuration of single-axes SAW gyroscope was researched.
介绍了 SAW 陀螺的基本原理以及输出电压公式,研究了 SAW 惯性导航系统的基本原理框架,并给出单自由度 SAW 陀螺的具体配置方案。
3.
In addition, many kinds of accelerometer-configurations are analyzed, and then the advantages and the disadvantages of each mathematic model are reviewed, and the future research is expected.
分析讨论了多种加速度计配置方案,评述了相应模型的优缺点。
6) allocation plan
配置方案
1.
The paper evaluates allocation plans of Heihe River Basin water resources by evaluation model.
利用构建的评价模型对拟定的黑河流域水资源配置方案进行合理性评价,通过对方案评价结果的分析,对水资源统一调度后的社会、经济、资源和生态效应进行科学评估,为最终制定流域的水资源合理利用与生态环境保护措施提供强有力的决策依据,对黑河流域水资源统一管理具有实际指导意义。
2.
In view of the above, this paper formulates a combination allocation plan on urban building land in Chengdu city.
针对我国现行城镇建设用地预测方法存在的问题,对城镇建设用地预测方法进行了探索性的研究,系统研究并建立建设用地需求的线性生产函数模型、恩格尔系数模型、时间序列的ARIMA模型、灰色系统模型等4类不同的城镇建设用地总量预测模型,对成都市城镇建设用地总量进行实证分析,并据此提出成都市建设用地配置方案。
补充资料:规模经济/规模不经济
规模经济/规模不经济:规模经济和规模不经济用来说明厂商产量变动从而规模变动与成本之间的关系。对于一个生产厂商而言,如果产量扩大一倍,而厂商的生产成本的增加低于一倍,则称厂商的生产存在着规模经济;如果产量增加一倍,而成本的增加大于一倍,则生产存在着规模不经济。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条