1) bonded steel structure
粘钢结构
2) stick steel strengthening
结构粘钢加固
1.
The application of stick steel strengthening technique,increasing section method,reinforcement treatment with carbon fiber sheet and other methods are respectively discussed.
根据具体工程概况,介绍了其加固设计思路,分别论述了结构粘钢加固、加大截面法、碳纤维布加固等方法在工程中的应用方法,通过多种加固方案的实施,该工程取得了良好的效益。
3) steel/wood structural bonding
钢木结构粘接
4) steel-epoxy resin-Al adhesive structure
钢/环氧树脂/铝粘接结构
5) strengthening by bonded steel plate
粘钢加固混凝土结构
6) breakout by sticking
粘结漏钢
1.
4 slab caster of JISCO,the reasons of breakout by sticking of 50# steel slab were analyzed systematically.
本文结合酒泉钢铁公司4#板坯生产实际,系统分析了50#钢粘结漏钢的原因,从保护渣、结晶器、冷却水以及工艺操作等方面有针对性地制定了措施,杜绝了粘结漏钢事故,稳定了生产。
2.
Analysis consider that the reason of breakout by sticking is bad capability of the powder,such as lower depth of liquid powder,less consumption and low proportion of glass phase in the powder.
分析认为,济钢大板坯连铸机出现粘结漏钢的原因是保护渣的性能不良,其中液渣层厚度、渣耗量及玻璃相比例偏低,以及结晶器液面波动,拉速提升过快等。
3.
It is shown that the breakout by sticking is caused by low temperature of molten steel and high withdrawal speed and illogicality capability of protecting slags.
通过统计分析板坯连铸生产中出现的漏钢事故,认为钢水温度低、拉速快和保护渣理化性能不合理易导致粘结漏钢;对弧不良、钢水温度高、拉速快是造成裂纹漏钢的主要原因;开浇和接头漏钢主要是中间包上水口和塞棒烘烤效果不好及出苗时间不足造成的。
补充资料:安装钢结构厂房钢柱
安装钢结构厂房钢柱
巍 安装钢结构厂房钢柱
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条