说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 公共期望
1)  Public anticipation
公共期望
2)  expected transport improvements
公共交通改善期望
1.
However, there have been few investigations of expected transport improvements.
以杭州地铁项目为例,基于大样本住房交易跨期综列数据,构建扩展的特征价格模型,通过比较期望交通改善和非改善区域在地铁项目传言、立项前后住房价格的变化,分析了公共交通改善期望对附近住房价格及其价格空间结构的影响。
3)  public expectations
公众期望
1.
In the process of the rapid advancement of urbanization,changes in public expectations are an important exogenous variable for the reform and development of government.
在快速推进的城市化进程中,公众期望的变化是政府变革和发展的重要外生变量。
4)  common cycle
公共周期
1.
Currently the common cycle of linear signal progression is determined by the critical intersection involved in coordination control,which ensures that the worst intersection will not be oversaturated.
现有线控公共周期确定取决于关键交叉口交通状态,其目的是满足交通状态最差的交叉口不会产生过饱和现象,但未考虑对实际线控效果影响且可能增大其他交叉口延误。
5)  conditional expectation formula
条件期望公式
6)  common due date
公共交货期
1.
A multi-objective optimization model for logistic distribution with common due date is presented with consideration of three-echelon distribution network,including customers,distribution centers and a mail post center as well as penalties to be incurred when items are delayed for any reason.
建立了带有公共交货期的多目标物流配送优化模型,考虑了3层配送网络中物品分配和运输模式选择,并对迟到完成的任务给予惩罚,所优化的目标为总费用最小化和分拣中心负载的平衡。
2.
A common due date for the jobs and job delivery time need to be determined in order to minimize the sum of the penalties (i.
目标是寻找所有工件的公共交货期和每个工件的送货时间使得工件所受到惩罚(提前/拖后惩罚,送货费用等)的值最小。
3.
The sequencing of n independent work pieces which are processed in a single machine shop is discussed in which each job is assigned a common due date k and each work piece processing time distribution is assumed to be independent normal distribution.
工件的加工时间服从正态分布 ,所有工件交货期设置公共交货期。
补充资料:电能不足期望值
      表示电力系统由于机组受迫停运而造成的对用户少供电能的期望值,这一指标能说明故障的严重程度,因为电力系统受限制的因素不仅仅是缺电力,更重要的是发电量的短缺。
  
  计算EENS指标时,一般必须先制订发电机组的停运容量概率表和小时负荷曲线。对某一已知停运容量状态,则每小时不足电量等于不足电力乘以此状态的概率,即EENS=(X-R)×P(X)式中X为停运容量,R为系统备用容量,P(X)为停运容量为X的确切概率。
  
  一年中EENS值可由下式计算:式中P(X)为第i时间段第j天第 k小时停运容量大于等于X的概率,Ci为第i时间段的系统装机容量,L为第i时间段第j天第K小时的负荷,m为一年中时间段,ni为第i时间段中的天数,K为一天中的第K小时。
  
  电能不足期望值综合表达了停电次数、平均持续时间和平均停电功率。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条