说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 管坝接缝面
1)  interface between dam and penstock
管坝接缝面
2)  crack on dam surface
坝面裂缝
3)  joint surface
接缝面
1.
Experimental research on the splitting tensile strength for joint surface of concrete construction joint;
混凝土施工缝接缝面劈拉强度试验研究
4)  slab joint
面板接缝
1.
Study on seepage calculation model of slab joints of CFRD;
混凝土面板堆石坝面板接缝的渗流计算模型研究
5)  pavement joint
路面接缝
6)  roof joint
屋面接缝
1.
The cause for deformation of roof construction layer and calculation methods for the amount of deformation were introduced, it was pointed out that key protection measures should be taken for the roof joint to prevent roof leakage economically and effectively, and detail construction and main points of construction technology for the key protection points were described
介绍了导致屋面结构层变形的原因及变形量的计算方法,指出屋面防水必须对屋面接缝部位采取重点防护措施,才能经济、有效地防止屋面渗漏,并对重点防护部位的细部构造与施工技术要点进行了论述。
补充资料:奥三面坝

奥三面坝

Okumiomote Dam


概  述

  奥三面坝位于日本新泻县岩船郡朝日村、三面川水系(Miomotegawa)三面川上,地处磐梯朝日国立公园内。非对称式抛物线混凝土拱坝,最大坝高116m,水库总库容1.255亿m3。工程目的为防洪和发电,兼有减轻下游洪水危胁和维持河道正常功能作用。电站最大装机容量34.5万kW。1981年开工,预计2001年竣工。
  坝址附近山头的高程多在400~500m,相对于河床的高差约250~300m。岸坡陡峻呈"V"形河谷,尤其是河床以上30m的岸坡近于垂直。
  坝址基岩以流纹岩质熔结凝灰岩为主。岩质坚硬,难以爆破,即所谓的"皱胃"基岩。但存在层面和节理等不连续面。
  坝址控制流域面积174.5km2,水库面积4.3hm2,有效库容1.08亿m3,防洪库容0.54亿m3,洪水期兴利库容为0.54亿m3,死库容0.175亿m3。正常蓄水位229m,设计洪水流量2400m3/s。设计洪水位238m,洪水期限制水位213.2m,设计泄流量2900m3/s。
  大坝坝顶高程239m,长244m,坝体积23万m3。设有3个表孔,非常泄洪用,最大泄量2900m3/s,设有1个中孔,正常泄洪用。在高程162m,设1个放水底孔。
  采用隧洞导流,隧洞内径5.8m。坝址区河谷狭窄,岸坡岩石开挖采用台阶式掘进法,并用锚杆加固岩坡。混凝土的浇筑使用两端行走式缆机进行,并用转运车来运送混凝土。