1)  jack up girder
顶升梁体
2)  bridge lifting
桥梁顶升
1.
During the infrastructure construction of the comprehensive developing projects in Haihe Area of Tianjin, Tianjin Urban Construction Design Institute adopted the synchronizing lifting technique successfully to meet the need of sailing headroom of existed bridges, which was the first practice about bridge lifting in China.
在天津市海河综合开发起步工程基础设施建设中,为满足旧有桥梁通航净空的要求,天津城建设计院在旧桥改造工程中,成功采用了同步顶升技术,填补了我国桥梁顶升的空白。
3)  means of jack-up
顶升梁法
4)  integrated roof timber
整体顶梁
1.
Aiming at the measurement of resistance of ZFS6800/18/35 support with integrated roof timber in 300 m super-long fully mechanized sublevel coal caving working, this paper analysed distributing character of support resistance and the reason why the front legs resistance is bigger than the back legs'.
针对300m超长综放工作面ZFS6800/18/35型整体顶梁支架阻力实测结果,分析了支架阻力的分布特点及前柱阻力大于后柱的原因,以此为基础对顶梁上载荷分布进行了理论研究,最后对影响支架性能发挥的主要参数进行了敏感性分析。
5)  integral lifting
整体顶升
1.
This article concretely describes the scheme design of integral lifting for the arch steel roof in Macau new inspection station,and the key technical problems are also outlined and analyzed,subsequently,the corresponding measures taken to solve these problems are proposed.
介绍了澳门关闸新边检站钢结构拱形屋盖的整体升高方案,对方案中的主要关键技术问题进行了探讨和分析,阐述了用于结构整体顶升的施工工艺原理及相关设备。
6)  lifting-up system
顶升体系
补充资料:顶升
      利用千斤顶和交替填塞的柱块,将在地面上就地拼装或灌筑成型的屋盖结构逐步顶升到设计标高的施工方法。这种方法无需大型起重设备,可将在地面施工完毕的整个屋盖,包括屋面防水、油漆及管线等,一次顶升就位。一般有上顶升和下顶升两种。
  
  ① 上顶升法。千斤顶倒支于屋盖结构支点下的垫块上,垫块即为以后的柱帽。开始时,柱帽支承于柱基块的两侧冀上,随着千斤顶的进油和回油,填进临时垫块和换填正式柱块,柱帽即将屋盖结构逐步升高。柱块为方形和门字形(见图)。柱块在安装时宜及时铺垫水泥砂浆及焊接帮条,并对柱块的开口加以封闭,以增强柱子的稳定性。上顶升法中千斤顶的顶升重量恒定,稳定性较好,目前采用较多。因属高空作业,顶升过程中应采取措施,防止屋盖结构偏移,并注意顶升的同步。
  
  
  ② 下顶升法。千斤顶始终放在柱基上,随顶随填柱块,可以减少高空作业,但顶升重量逐渐增加,尤其是在柱基处形成活动支点,稳定性差,已较少采用。
  
  顶升法也有用格构柱的,比填柱块安全,能防止结构偏移。
  