1) Wanbahe Power Station
湾坝河水电站
1.
The Vibration & Impulsion Treatment of Soft Foundation of Wanbahe Power Station;
湾坝河水电站软基加固中的振冲施工技术
2) Yaoheba Hydropower Plant
姚河坝水电站
1.
Technology of Cooling Water Supply from Turbine Head-cover and Application in Yaoheba Hydropower Plant;
水轮机顶盖取水技术及其在姚河坝水电站的应用
3) Changheba Hydropower Station
长河坝水电站
1.
Analysis of concrete flaws in diversion tunnel of Changheba Hydropower Station and repairing for them;
长河坝水电站导流洞混凝土缺陷分析及修补
2.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
3.
In the dam site of Changheba Hydropower Station on Dadu River,the valley is deeply incised;and the slope made up of granite and quartz-diorite is high and steep.
采用孔径变形法对大渡河长河坝水电站坝址区斜坡深部地应力场进行测试,并采用简易、快速、经济的硐壁应力恢复法对坝址区两岸不同高程勘探平硐内的硐壁应力场进行系统测试。
4) Zhanghewan Pumped-storage Power Station
张河湾抽水蓄能电站
1.
Bituminous Concrete Construction Technology of Upper Reservoir of Zhanghewan Pumped-storage Power Station
张河湾抽水蓄能电站上水库沥青混凝土施工技术
6) Manwan Hydropower Station
漫湾水电站
1.
Application of two types of cylinder valve synchro-step device in Manwan Hydropower Station;
两种筒阀同步装置在漫湾水电站的应用
2.
Problems of scouring and erosion on water cushion basin in Manwan hydropower station and its measures;
漫湾水电站水垫塘冲蚀磨损问题及对策措施
3.
Resultant Discharge Method applied in Flood Prediction at Manwan Hydropower Station;
合成流量法在漫湾水电站洪水预报中的应用
补充资料:大亚湾核电站
大亚湾核电站 中国90年代兴建的规模最大的核电站。位于广东省大亚湾畔的大坑村。由广东核电投资有限公司和香港核电投资有限公司合资建设,1984年4月动工。电站范围198万平方米,厂区占地63.5万平方米,反应堆采用法国制造的2台900兆瓦压水堆,90 厘米厚的预应力钢筋混凝土密闭安全壳可承受 5个大气压。电站装有2套各900兆瓦的汽轮发电机组,年发电量可达 100亿千瓦时。电站投产后,70%的电力供应香港,30%供应广东。1号机组于1993年8月21日并网发电,1994年2月投入商业运行。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条