1) simplified calculation method of elastic bearing continuous beam
弹性支承连续梁简化计算方法
2) elastically supported continuous beam method
弹性支承连续梁法
1.
So this paper offers a new method, named elastically supported continuous beam method, for calculating transverse distribution of load of continuous skew box multi-girders bridges, based on the theory of single span skew bridges and continuous skew bridges, and the method for calculating transverse distribution of load of sing.
结果表明,所提出的弹性支承连续梁法计算值,与空间有限元分析理论值及荷载试验测试值吻合得较好。
3) continuous beam on elastic support
弹性支承连续梁
5) ameliorated continuous rigid-support beam method
改进刚性支承连续梁法
6) method of continuous beam with rigidity support
刚性支承连续梁法
补充资料:工资总额弹性计划计算方法
W=C1 +C2 PGNP+C3 W(--1)
W--计划期工资总额计划到达数
W(--1)--上年工资总额年报数
PGNP--计划期现价国民生产总值绝对数
C1 为常数项
C2 为PGNP系数
C3 为上年工资总额余数
W--计划期工资总额计划到达数
W(--1)--上年工资总额年报数
PGNP--计划期现价国民生产总值绝对数
C1 为常数项
C2 为PGNP系数
C3 为上年工资总额余数
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条