说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 互操作实验
1)  interoperability test
互操作实验
1.
Based on the research of all the previous foreign interoperability tests, some suggestions for Chinese manufacturers is provided, which are the interoperability tests should be divided into several phases according to the successive approach rule, and the necessary monitor tools and analyzer should be used during the te.
为此,不同厂家之间需要进行必要的互操作实验
2)  experimental operation
实验操作
1.
Based on the characteristics of biology and the acquisition of experimental skills,this article talks about biological experiment course check in higher institutes in such three aspects as routine experiments,experimental operation and experimental theory.
结合生物学科的特点和实验技能的形成过程,从实验平时、实验操作和实验理论三个方面论述了高校生物实验课的考核。
2.
This article expounds the functions of experimental operations andpractical activities in math teaching from the sides of inspiring interest, enriching fancy, illumining thinking and cultivating character.
从激发兴趣、丰富想象、启发思维、培养品质等几个方面阐述了实验操作与实践活动在数学教学中的作用。
3)  experiment operation
实验操作
1.
The practice and research to form the assessment standard for skills in physical experiment operation
构建物理实验操作技能测评标准的实践与研究
2.
And overall, objective and reasonable test in the experiment operational of the student is good for increasing teaching quality of analytical chemistry experiment.
本文提出了分析化学实验操作考核的具体内容和方法。
3.
The writer talks over the important effect and its meaning of training students quality - oriented education in view of the experiment operation in the middle school entrance examination.
中招理、化、生实验操作考试是中等教育招生制度的一项重要改革措施,作者针对中招实验操作考试,对全面培养学生素质过程中产生的重要作用和意义,进行了论述。
4)  interoperability test
互操作试验
1.
The conditions about the six interoperability tests of IEC 61850 which have been carried out in China are described in detail,including the processes and results,the encountered problems,the solving schemes and the obtained achievements.
介绍了中国开展IEC 61850研究的背景,较全面地描述了已进行的6次互操作试验的情况、遇到的问题、解决方案以及互操作试验取得的成果,并就下一步急需开展的工作提出了建议。
2.
The significance of the separation/combination of CIM/XML based power system models is illustrated in terms of brief introduction to the IEC61970 standard and the interoperability tests.
通过简单介绍IEC 61970标准的公共信息模型 (CIM)以及基于CIM/XML文件的互操作试验 ,阐明了将电力系统模型进行拆分和合并的意义 ,给出了基于CIM的电力系统模型拆分 /合并的原则和方法。
3.
An IEC61850-based interoperability test platform is built to test the interoperability of a 220 kV digital substation.
针对IEC61850标准建立了一套验证互操作的平台,对某220 kV数字化变电站进行了互操作试验。
5)  micro-operation experiment
微操作实验
6)  manipulative experiment
操作性实验
补充资料:保险商实验室安全标准(见保险商实验室)


保险商实验室安全标准(见保险商实验室)
safety standards of UL: see Underwriters Laboratories; UL

  Baoxianshang Sh啊nshi anquan bicozhun保险商实验室安全标准(saJ七ty stand助dsofUL)见保险商实脸室。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条