1) channels uplift reduction by drainage
排水减扬压
2) water-discharging pressure reducer
排水减压
3) pressure releasing and drainage system
减压排水系统
1.
This paper mainly introduces the construction techniques and management for cast-in-situ concrete dock wall,pressure releasing and drainage system and foundation pit explosion for Zhongshan Zhongyuan Ship Dock #1 and # 2.
本文介绍舟山中远1号和2号船坞大型钢模现浇坞墙混凝土、减压排水系统施工、基坑爆破开挖等施工工艺及施工管理。
4) uplift water level
扬压水位
1.
Analysis of dam foundation uplift water level observation resultin Guanyinge reservoir;
观音阁水库大坝坝基扬压水位观测成果分析
5) Drainageand decompression
排渗减压
6) decompression drainage
减压排渗
1.
According to the experience of landslide treatment,The construction methods of catchment shaft and the effect of decompression drainage are introduced.
滑坡治理是一项综合的课题,驷马山引江工程切岭段滑坡在治理过程中普遍使用集水竖井的方法,取得了明显的效果,文章根据在切岭段滑坡治理过程中积累的经验,详细介绍了集水竖井的施工方法和减压排渗的效果。
补充资料:减缘减行
【减缘减行】
(术语)缘者,指上界四谛与上二界四谛之八谛。行者,指欲界四谛下十六行相与上二界四谛下十六行相之三十二行相。自声闻乘四善根之初至忍法之上忍,连环普观此上下八谛之三十二行相,同自中忍之位,一行减之,遂至留苦或道等之一行相,谓之减行,每减其四行相自减一谛,故谓之减缘。其所以减之者,泛观上下八谛之三十二行相,观智浮漫而不猛利,故自中忍以后渐渐狭其观境,以养成猛利之观智,遂为发真无漏智之算引也。上下八谛之三十二行相,第一回自第一观至第三十一,因而减去第三十二即上界道谛下出之一行相,第二回更自第一观至第三十,因而减去第三十一即上界道谛下行之一行相。如此每一周自下逆次减一行相,终至减第一即欲界苦谛下苦之一行相。即减去者,三十一行相也。减此三十一行相中,每第四周减一谛,故谓之减缘,减于他三周之行相,谓之减行。即减缘七周,减行二十四周,合于三十一周减去三十一行也。第四周谓之减缘者,上下八谛,为所缘之境,三十二行相,为对于此之能缘观解,故减四行相即减所缘之境一谛也。因而逆次减去,每至第四行相,不谓为减行,特附以所谓减缘即减谛之名耳。(参见:行相)
(术语)缘者,指上界四谛与上二界四谛之八谛。行者,指欲界四谛下十六行相与上二界四谛下十六行相之三十二行相。自声闻乘四善根之初至忍法之上忍,连环普观此上下八谛之三十二行相,同自中忍之位,一行减之,遂至留苦或道等之一行相,谓之减行,每减其四行相自减一谛,故谓之减缘。其所以减之者,泛观上下八谛之三十二行相,观智浮漫而不猛利,故自中忍以后渐渐狭其观境,以养成猛利之观智,遂为发真无漏智之算引也。上下八谛之三十二行相,第一回自第一观至第三十一,因而减去第三十二即上界道谛下出之一行相,第二回更自第一观至第三十,因而减去第三十一即上界道谛下行之一行相。如此每一周自下逆次减一行相,终至减第一即欲界苦谛下苦之一行相。即减去者,三十一行相也。减此三十一行相中,每第四周减一谛,故谓之减缘,减于他三周之行相,谓之减行。即减缘七周,减行二十四周,合于三十一周减去三十一行也。第四周谓之减缘者,上下八谛,为所缘之境,三十二行相,为对于此之能缘观解,故减四行相即减所缘之境一谛也。因而逆次减去,每至第四行相,不谓为减行,特附以所谓减缘即减谛之名耳。(参见:行相)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条