Prevention and control of ground water surge with high pressure and large flow for construction of auxiliary tunnel of Jinping Hydropower Station;
锦屏水电站辅助洞高压大流量地下涌水的预防与治理
2) phreatic discharge(of water)
地下水涌流量
4) high-pressure blow
高压涌水
1.
Geology conditions of typical high pressure blows were described in this paper,and it s very significant for paroxysmal high-pressure blow forecasting in the process of tunnel drivaging.
文中介绍了几种典型高压涌水形成的地质条件,为了防止在隧洞掘进过程中出现突发性高压涌水,采用宏观地质预报、微观地质预报及探地雷达预报提前预测可能存在高压涌水的位置、水量和水压等,并且对一些富含高压水构造提出了一些相应的施工对策。
6) high-pressure groundwater
高压地下水
1.
The research for the numerical simulation technotloy of high-pressure groundwater sealing grouting;
高压地下水封堵注浆计算机模拟技术研究