1) Intermediate reach of dam
厂坝区间河段
2) reach between two dams
两坝间河段
3) powerhouse dam section
厂房坝段
1.
Stress-strain analysis for powerhouse dam section of Tuka Hydropower Station;
土卡河水电站厂房坝段应力应变研究
2.
The reinforcement arrangement in the opening of diversion pipe in the powerhouse dam section of Three Gorges Project was calculated and studied by using the three dimensional non linear finite analysis method and taking the joint action of steel bar and concrete into account.
:采用三维非线性有限元分析方法 ,考虑钢筋和混凝土的联合作用 ,对三峡厂房坝段引水管道孔口配筋方案进行计算研究 ,求出了设计工况下引水管道孔口周围混凝土和钢筋的开裂和屈服范围。
4) river bed dam section
河床坝段
5) gravel bed-load
近坝河段
1.
The problems of gravel bed-load transport in downstrean reach below the dam are very complicated.
水库下游近坝河段推移质输沙问题十分复杂,涉及到多方面因素的影响。
6) river section under the dam
坝下河段
补充资料:钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条