1) underpinned pile
托换桩
1.
In connection with the segmental tunneling across a viaduct in the project of Guangzhou Metro Line 5, introduction is made of the chiseling off works through the pile foundation, including the construction of the shaft, transverse passage, chiseling off the underpinned pile, backfilling, etc.
结合广州地铁五号线盾构区间隧道穿越高架桥的工程案例,介绍了穿越桩基的凿除施工中竖井施工、横通道施工、被托换桩凿除施工、回填施工等具体方法。
2) pile foundation underpinning
桩基托换
1.
The application of pile foundation underpinning in the NO.3 line of Guangzhou metro;
桩基托换在广州地铁三号线中的应用
2.
The construction scheme and procedure of pile foundation underpinning of No.
介绍了广州地铁一号线桩基托换施工的方案和顺序,详细叙述了施工全过程监测的目的、项目、测点布置、控制标准和监测频率,对沉降位移监测的结果进行了分析。
3.
Taking the pile foundation underpinning made during the construction of the shield-bored tunnel on line 5 of Guangzhou Metro as example,the authors present in detail the design and constru.
以广州地铁五号线盾构区间建筑物桩基托换为例,详细讲述桩基托换设计、施工全过程,给类似工程的设计、施工提供参考。
3) pile underpinning
桩基托换
1.
Combining the project of pile underpinning between Lijiao and Xiajiao of Line Three of Guangzhou Metro,the paper introduces the design,construction procedure and monitoring of the pile underpinning.
结合广州市轨道交通三号线沥-厦区间桩基托换工程实例,介绍了托换体系的设计、施工步骤和监测。
2.
The Beihuo Guangchang pile underpinning project,with la rg e underpinning axial load and complex construction environment,is one of the imp ortant parts of the Shenzhen Metro project.
深圳地铁百货广场桩基托换工程 ,采用“梁抱柱”托换方案 ,由于托换柱轴力大、梁 -柱结合周长小、接合处承受剪力大、接头处于斜交状态 ,接头受力复杂 ,因此接头强度是托换成败的关键。
3.
Pile underpinning is an application technique with a high content of science and technology in underground engineering construction.
桩基托换在地下工程建设中是一项科技含量较高的应用性技术,深圳地铁一期工程国贸—老街区间隧道从百货广场大楼下桩基丛中穿过托换,该工程具有桩的荷载大、地层条件复杂、地下水位高、托换深度大等特点,难度较大。
4) underpinning
[英][,ʌndə'piniŋ] [美][,ʌndɚ'pɪnɪŋ]
桩基托换
1.
Test and Study of Shenzhen Metro High-load Pile Foundation Underpinning Model;
深圳地铁大轴力桩基托换模型试验研究
2.
Research on application of finite element method to underpinning;
有限单元法在桩基托换的应用研究
3.
Taking several projects as example,the author introduces the application of partition method,grouting reinforcement method and underpinning method in the construction of Metro tunnels passing underneath surface buildings/structures.
结合不同的工程实例,介绍隔断法、注浆加固法、桩基托换法等保护方法在地铁区间隧道穿越建筑物基础时的应用及施工技术措施,并总结其适用条件,希望对类似工程的设计和施工提供一定的借鉴作用。
5) soil substitution with pressure piles
压桩托换
6) pile and beam underpinning
托换桩梁
补充资料:基础托换
对原有基础进行加固和更换,以改善基础工作状态的技术措施。基础需要托换的原因很多,如在现有建筑物下进行隧道施工;地下水位下降引起房屋下沉;原有基础腐蚀或损坏等。托换技术已有数百年历史。但是,直到20世纪,由于大量兴建地下铁道,此技术才得到较大发展。
常用的托换技术有:①将拟托换的基础上的荷载传递到桩(或沉井)上。设置桩的方法有:千斤顶压入法、打入法及钻孔灌注法等。桩可能是粗直径的,定向排列的群桩,也可能是细直径的、不定向排列的树根桩。②从原结构物基底向下挖坑达到合适的地基持力层,然后用混凝土填充形成墩,使荷载传给墩;或者将基础扩大,以减小基底压力。这些方法适用于地下水位以上的基础。
托换基础施工要严格控制质量,保证原有基础与托换部分连接,使荷载能有效传递。同时,施工需分段进行,以避免原有建筑结构的应力变化过大,使安全得到确实保证。有时将基础托换与地基处理措施(如化学灌浆)结合进行,可以得到较好的效果。
常用的托换技术有:①将拟托换的基础上的荷载传递到桩(或沉井)上。设置桩的方法有:千斤顶压入法、打入法及钻孔灌注法等。桩可能是粗直径的,定向排列的群桩,也可能是细直径的、不定向排列的树根桩。②从原结构物基底向下挖坑达到合适的地基持力层,然后用混凝土填充形成墩,使荷载传给墩;或者将基础扩大,以减小基底压力。这些方法适用于地下水位以上的基础。
托换基础施工要严格控制质量,保证原有基础与托换部分连接,使荷载能有效传递。同时,施工需分段进行,以避免原有建筑结构的应力变化过大,使安全得到确实保证。有时将基础托换与地基处理措施(如化学灌浆)结合进行,可以得到较好的效果。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条