说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 成层土
1)  layered soil
成层土
1.
Analysis and application in engineering on vertical vibration of viscoelasticity piles in layered soil;
成层土中粘弹性桩纵向振动分析及工程应用
2.
Analysis of settlement induced by dewatering during excavation in layered soil;
成层土中基坑开挖降水引起的地表沉降分析
3.
Torsional vibration of pile in layered soils with considering soil-pile interaction
成层土中桩土耦合扭转振动特性理论研究
2)  layered soils
成层土
1.
Considering the vertical wave effect on the soil layer,the interaction between the visco-elastic layered soils and a integral pile or a multi-defective pile with arbitrary bottom boundaries and the dynamic response at the pile head to an arbitrary dynamic load is theoretically investigated.
从三维轴对称角度出发,采用粘性阻尼粘弹性连续土介质模型,考虑桩土相互作用效应,对成层土中桩土纵向耦合振动时的桩顶时域响应进行了解析研究。
2.
In order to reasonably interpret pile integrity test,the model of viscoelastic pile with variable sections in layered soils is established.
为了合理解释成层土中桩的完整性测试,建立了桩端为弹性阻尼支承、桩顶在任意荷载作用下粘弹性变截面桩与多层土共同作用的数学模型,并利用拉普拉斯变换和矩阵理论求得了该模型的振动半解析解,然后利用卷积定理和傅立叶逆变换求得瞬态半个正弦波作用下桩顶响应的振动半解析解。
3.
An analytical solution of the vertical vibration for a pile in layered soils is proposed in the paper.
建立了成层土中考虑桩端和桩侧土作用的有限长桩在任意激励力作用下的定解问题 ,并用拉氏(Laplace)变换和阻抗传递函数求得任意层土中桩顶速度和位移响应函数的解析表达式 ,然后利用卷积定理和付里叶 (Fourier)逆变换求得半正弦脉冲激振力作用下桩顶的速度时域响应的半解析解 (积分形式解 )。
3)  layered-soil
成层土层
1.
Identification of parameters of 2-DOFs lumped-parameter model of layered-soil;
这种模型适合各向同性的单一土层,而实际工程场地的地基土多是各向异性的成层土层。
4)  layered soft-soil
成层软土
1.
In order to study the effect of tunnel to nearby structure on layered soft-soil with different foundations,non-linear interaction finite element model was set up,which is composed of structure,foundation,soil and tunnel.
为了研究隧道对成层软土地基上不同基础形式建筑物地震反应的影响,构建了结构-基础-土-隧道体系动力相互作用的非线性完全有限元计算模型,在考虑土体重力的前提下,对筏片基础、桩筏基础相互作用体系进行了时域内数值分析。
5)  layered slopes
成层土坡
1.
It is showed that,for homogeneous slopes,the safety factor deduced from shear strength reduction is appropriate,while the stress or strain field was changed,so can not be used to analyze the slopes,and for layered slopes,neither right stress or strain field nor the safety factor can be got by reducing strength parameters c and simply.
通过实例讨论了强度折减有限元法分析成层土坡稳定的可行性,分析表明:对于均质土坡,强度折减得到的安全系数在工程允许的范围之内,但折减后的应力场发生了变化,不能用于分析原土坡的稳定性;对于多层土坡,通过简单折减土的强度指标c,tanφ,不能得到正确的应力场,也不能得到土坡的安全系数。
6)  layered medium-soft-soil
成层中软土
1.
Seismic effect of river on nearby structure on layered medium-soft-soil;
地震作用下河流对成层中软土上建筑物的影响
补充资料:单层厂房预制钢筋混凝土结构安装


单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building

daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条