1) Planning of Line Network
线路网规划
2) trunk line network planning
干线路网规划
3) net line planning
网络线路规划
4) power transmission line planning
输电网线路规划
1.
In power transmission line planning how to make the length of transmission line the shortest is an important factor that the designer should consider.
在输电网线路规划中,如何使得线路长度最短是工程设计人员必须考虑的一个重要因素。
5) network plan
路网规划
1.
The problems existed in the original network plan of Shanghai rapid rail transit are diagnosed, and then the design principles and the improving network plan of Shanghai rapid rail transit is proposed.
分析目前上海市轨道交通路网规划方案存在的问题 ,对东京、巴黎等国际特大城市轨道交通路网设计的经验作了分析和概括。
2.
After summing up and analyzing the characteristics and defects of the evaluation indexes existed of urban rail transit network plan, a set of evaluation index system is proposed which is fit to the evaluation of urban rail transit network plan in China.
总结了现有的城市轨道交通评价指标体系 ,在对各项指标进行分析比较的基础上 ,提出一套适合我国城市轨道交通路网规划方案优选的评价指标体系。
3.
Research purposes:Reasonably determining the role and consequence of lines in the regional railway network has great significance to the reasonable railway network plan and deployment of railway technical standard,however,the quantitative methods are still absent now.
研究目的:合理确定线路在铁路网中的作用对合理进行路网规划、合理配置线路技术标准具有非常重要的作用,但目前尚无定量的研究方法。
6) road network planning
路网规划
1.
Research on procedure for urban road network planning under complex terrain conditions;
复杂地形条件下的城镇路网规划步骤研究
2.
Traffic volume forecasting method at road interchange based on road network planning;
基于路网规划的道路立体交叉交通量预测方法
3.
This paper reviews the international experiences of transit oriented urban road network planning method especially Curitiba and summarizes the general method of the planning.
在回顾国外公交导向路网规划方法的基础上,总结了公交导向路网规划的一般方法,并通过上海临港新城公交导向的路网规划实例进行了具体说明。
补充资料:冶金厂矿电信线路网设计
冶金厂矿电信线路网设计
design of telecommunication network for mine and metallurgical works
yelin ehangkuang dianxin xianluwang sheji冶金厂矿电信线路网设计(designofteleeommunieation network for mine and me-tall urgieal works)合理布里和敷设冶金厂矿各种电信线路网的设计。电信线路网由电话站引往各个方向的干线、配线电缆系统组成,每个方向的千线、配线电缆系统根据各自的地区条件、用户分布特点和发展要求等因素,组成一个独立的而各个电缆系统之间又互有联系的区域.设计内容主要包括电话站站址确定、传输损耗分配、配线方式和交接区划分以及电缆敷设方式。 电话站站址确定根据远近期用户分布规划,要尽量接近用户负荷中心.并应满足下列要求:(1)电话站要有良好的环境,不要设在温度高、灰尘多、有害气体多、易爆以及低洼地区;(2)要避开经常有较大展动或强噪声的地方;(3)要避开总降压变电所和牵引变电所;(4)要便于维护管理和及时投产;(5)在地展基本烈度6度以上地区,要远离烟囱、水塔和简仓等高耸构筑物. 传输损耗分配一个通话连接的全程传输损耗是由用户线、交换机和中继线等三部分组成的传翰损耗之和,传输损耗值以分贝(dB)为单位.传输损耗分配是在保证线路网符合规定的传输损耗标准和设备信号电阻限值的前提下对用户线、交换机和中继线进行设备跳接的配线方式。复接配线是指,电缆线路间有一损耗分配,经济合理地选择线路网各段的线路设备程定数量的芯线并联连接的配线方式。式(包括电缆芯径、长距离用户中继器等),以便使线_ 一万一CSA TmA TmA CSA路网的投资和用铜量最少。杏一一刊多-一代}一一{卜一一嘴 中国的冶金厂(矿)采用国内通用的长途和市内电}‘29.。}话传输损耗标准。长途电话模拟网全程传输损耗不应}‘70{·P
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条