1) existing building
既有房屋
1.
The application of new sample plan in concrete compressive strength inspection of existing buildings structure;
新型抽样技术在既有房屋混凝土强度检测中的应用
2.
Approach of sampling plan for quality inspection of element in existing building;
既有房屋构件质量评定检测抽样技术研究
3.
Methods suitable for evaluating the feasibility of various upgrading schemes for existing buildings are few currently.
目前对既有房屋加层改造的方案决策还缺乏科学系统的方法。
2) Existing buildings
既有房屋
1.
The realistic sense of story-adding for existing buildings is discussed.
阐述了既有房屋加层改造的现实意义,简要介绍了国内外既有房屋加层改造的发展历史、现状和趋势。
3) used masonry building
既有砌体房屋
1.
Two kinds of design of reforming the used masonry building to large space construction,including "replace brick wall with bearing beam" and "replace brick masonry structures with partial bottom frame",are discussed in this paper.
本文讨论了两类既有砌体房屋大开间改造工程——"墙承重改为梁承重"和"形成局部底部框架砖房"的设计,分析了结构计算的内容和设计方法,并提出了加固补强的途径。
5) existed workshop
既有厂房
1.
After inner deep excavation of large area in an existed workshop,the column base near the slope of foundation pit has an appreciable horizontal displacement due to soil pressure,which results in severe cleavage of the columns.
某既有厂房内部大面积深开挖后,基坑边坡附近的柱基础因土压力作用发生明显的水平位移,柱身严重开裂。
补充资料:《房屋修缮工程质量检验评定标准》
《房屋修缮工程质量检验评定标准》
《房屋修缮工程质量检验评定标准》中国建设部颁布的规章之一。房屋修缮施工单位对完成的工程项日,要根据《房屋修缮工程质量检验评定标准》评定质量等级.进行竣工验收,不合格的不准交工。在工程正式交验前应预检,对整个工程项目、设备运转情况及有关技术资料全面进行检查,对检查出的问题应做好记录,定期解决,然后才邀请发包、设计单位正式验收。竣工验收的依据一般应包括:工程合同、修缮设计或修缮方案,及有关图纸或技术说明、会审交底记录、设计变更鉴证、材料试验报告单、隐蔽工程验鉴记录、房屋设备安装试调和试压记录等技术资料。竣工交验标准是:全部完成合同及设计(方案)要求的工程内容,质量符合标准及设计(方案)要求;具备住用条件,门窗开闭灵活、严密,灯亮,水通,煤气通,烟道通,暖气热,装修设备完好,场地整洁,排水和道路畅通,余料弃土清理完毕;技术资料齐全、准确;作出质量评语,填写单位工程质量评定表;原有修缮设计图纸的工程,要提交竣工图。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条