1) adjusting price
调整电价
2) bidding price adjustment
电价调整
1.
Aiming at the congestion in power market, the idea of bidding price adjustment and the corresponding methodology are presented.
针对电力竞标市场中出现的输电阻塞 ,提出了电价调整机制的想法 ,并给出相应的数学模型。
3) value adjustment
价值调整
4) price adjustment
价格调整
1.
On the application of adjustment formula method in price adjustment of highway engineering;
浅谈调值公式法在公路工程价格调整中的应用
2.
Model and Computation of a Kind of Price Adjustment Problem;
一类价格调整问题的数学模型及其求解方法
3.
Study on Method of Construction Contract Price Adjustment under Building Materials Price Fluctuate;
建材价格波动时施工合同价格调整方法的研究
5) water price adjustment
水价调整
1.
Taking the contract terms of water price adjustment during licensed operation period of investment project for the Guiyang Xiaohe Wastewater Treatment Plant and the practical operation as example,the risk and avoidance modes in investment projects for WWMP were analyzed.
以贵阳小河污水处理厂特许经营期间水价调整合同条款及实际操作为例,对污水处理厂投资项目中的风险及其规避方式进行了分析,探讨了污水处理厂投资项目如何通过水价调整来达到政府、企业双赢的若干问题。
6) cost adjustment
价款调整
1.
The method and principle of cost adjustment after project change are elaborated as well as the content and method of contract management for project change, which has a certain reference value to similar work.
介绍了水峪水库除险加固工程变更的合同管理 ,阐述了工程变更后价款调整的程序及调整原则 ,提出工程变更合同管理的内容和方法 ,对同类工程有参考价
补充资料:丰枯电价(见季节电价)
丰枯电价(见季节电价)
seasonal power price
丰枯电价(seasonal power priee)在水电为主的电力系统中,对于专门利用丰水季电能的用户或在丰水季增加用电量的用户实行的优惠电价(见季节电价)‘(张工)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条