说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 冷库施工
1)  construction of cold storage
冷库施工
2)  construction chart
施工图库
3)  construction inside interface
施工冷缝
1.
Combined with project survey and aiming at the problems that are construction inside interface,beam body crack generated by bad pouring of beam-and-slab concrete,bad construction of beam-and-slab and bad bottom die removal methods,it analyzes the corresponding reasons and brings forward corresponding prevention measures and treatment methods in order to ensure project quality.
结合工程概况,针对梁板混凝土浇筑不当、梁板施工方法不妥、梁底模拆除方法不正确而造成施工冷缝、梁体裂缝的问题,对其原因进行了分析,并提出了相应的预防措施及处理方法,以确保工程质量。
4)  cold-process construction
冷作施工
1.
Combined with practical work the cold-process construction for external and internal wall plastering in winter is introduced from the features of cold-process, antifreezing agent selection and other aspects.
结合工程实例 ,介绍了冬期内外墙面抹灰冷作施工方法 ,从冷作施工的特点、施工工艺和经济效益比较等方面做了较详细的叙述 ,为今后类似工程的施工 ,提供了可借鉴的经
5)  construction data-base
施工数据库
6)  construction of cooling tower
冷却塔施工
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条