说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 合理的施工温度
1)  appropriate construction temperature
合理的施工温度
2)  construction temperature
施工温度
1.
Influence of construction temperature on performance of giant reinforced concrete coal silo;
施工温度对巨型贮煤筒仓结构性能的影响
2.
Through analyzing the characteristics of modified asphalt and SMA pavement,the author discusses quality control measures in the construction of modified asphalt and SMA pavement construction from construction temperatures of modified asphalt and SMA pavement,and mixing,transportation,paving and rolling of modified asphalt and SMA mixture,in order to offer a reference for similar engineering.
通过分析改性沥青及SMA路面的特性,从改性沥青与SMA路面的施工温度、改性沥青与SMA混合料的拌制、运输摊铺及其碾压成型等方面探讨了改性沥青及SMA路面施工中的质量控制措施,以供类似工程参考。
3.
This paper introduces construction control elements of SBS modified bituminous mixture from construction temperature requirement,preparation work before construction,quality control of mixing mixture,paving,rolling and joint treatment,which to ensure safe and high-effective operation of modified bituminous pavement.
从施工温度要求、施工前准备工作、混合料拌合质量控制、摊铺、压实、接缝处理等方面介绍了SBS改性沥青混合料的施工控制要点,以保证改性沥青路面的安全、高效运营。
3)  high temperature construction
施工温度高
4)  temperature control in construction of basement during the winter
冬季地下室施工的温度措施
5)  hangling of rejected lots
不合格施工的处理方法
6)  minimum application temperature
最低施工温度
1.
Experiments found that due to improper control of minimum application temperature for water emulsion coatings,finish quality in Shanghai area was affected considerably.
通过实验发现因对水乳型涂料的最低施工温度控制失当 ,使上海地区涂饰质量受到了影响。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条