说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 路基隆起
1)  railway groundwork upwarping
路基隆起
1.
Analysis of railway groundwork upwarping caused by jet grouting in high pressure;
高压注浆加固造成铁路路基隆起的原因分析
2)  Basement uplift
基底隆起
1.
Seismic evidence of the basement uplift in the Bayan Har tectonic belt,Qinghai,and its tectonic significance;
青藏高原北部巴颜喀拉构造带基底隆起的地震学证据
2.
This study suggests that the basement uplift,warpage and basement fault block activity caused by basement compression and contraction under regional compressive setting are primary dynamic mechanism induced extensional deformation of overlying cap rocks,while the paleo-structural framework is the premise co.
分析认为,区域挤压背景下,由基底挤压收缩造成的基底隆起、翘曲和基底断块隐伏活动是诱导上覆盖层引张构造变形的主要动力机制,古构造格架特征是决定正断层成因发育的先决条件。
3)  foundation heave
基坑隆起
1.
Utilize FLAC3D business software to analyze types of soil nailing (total length type, interlock size type, up long down short type, and up short down long type) which affect the horizontal displacement and the displacement of foundation heave, then use numerical simulation to analyze the influence.
模拟结果表明:全长型和大小交错型土钉支护类型对控制基坑最大水平位移可以起到良好的效果,但从技术和经济两方面考虑,大小交错型土钉支护最适宜深基坑支护;对于不同的土钉支护,基坑侧壁位移和基坑隆起位移存在一定的耦合关系。
4)  foundation uplift
基础隆起
5)  Basal heave
基底隆起
1.
is the basal heave as causing of the displacement and settsettling of the soil behind wall.
基底隆起导致墙后土体位移是基坑失稳的模式之一。
6)  foundation pit bouom soil resilience
基坑底土体隆起
补充资料:大兴隆起

北京活动构造带。斜贯北京小平原中部,呈北东走向,隐伏于地表之下。面积约为1300平方公里。大兴区域大部处于隆起的中部。其西北侧为北京凹陷,东南侧为燕郊-牛堡屯断裂、大厂凹陷,两侧分别以南苑-通州断裂带及永乐店-夏垫-马坊断裂带为界。南段与南各庄-长子营断裂、廊固凹陷为邻。隆起西北高而东南低,高点埋深仅几十米,位于黄村镇与南苑镇之间,形成于第三纪,上覆50~1000米左右的第三系和第四系地层,内幕是由中上元古界和古生界组成的蓟县系、青白口系、寒武系、奥陶系地层。次级背斜轴部在高点东向,约在榆垡-马驹桥一线。新生界地层由西北向东南逐渐加厚。大兴隆起的两侧有次一级的断裂下降活动,与北京凹陷相应,形成地垒式的构造。隆起的上部地表呈平原地貌形态。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条