1) two-shift system
两班制
1.
The paper puts forward that,the main factor to affect the two-shift system start-up speed of S109FA-SS gas-steam combined cycle unit are: the matching time of high pressure cylinder metal temperature and high pressure main steam temperature being too long and the temperature rise of natural gas being slow etc.
文章提出了影响S109FA-SS燃气轮机联合循环机组两班制启动速度的主要因素为:高压缸金属温度与高压主蒸汽温度匹配时间过长、天然气温升慢等,并从运行操作、逻辑设计等方面提出了相应的改进措施,如加快高压缸金属温度和高压主蒸汽温度的匹配速度和加快燃机燃烧室入口处天然气温升等,从而达到提高机组两班制启动速度的目的。
2) two-shift operation
两班制运行
1.
Feasibitlity of participation of imported 300 MW unit in two-shift operation;
引进型300MW机组参与两班制运行的可行性
2.
Gas turbine generating unit features quick start-up,hence the gas turbine power plant is designed generally as the peaking power plant in the power grid;and to adopt two-shift operation mode.
燃气机组具有起动迅速的特点,故一般设计为电网调峰电厂,采用每天两班制运行方式。
3) two shift peaking system
两班制调峰
4) Star-stop loss in two-shift operation
两班制启停损失
5) Yang Ban Jun
《两班传》
1.
Comparison of Sarcasm in Fan Jin Zhong Ju and Yang Ban Jun;
《范进中举》和《两班传》讽刺艺术之比较
6) double-shift work
两班倒
补充资料:两班
高丽、李氏朝鲜时期居于统治地位的官僚地主阶级。李朝中期以前,指以功臣、贵戚等贵族为核心的文武官吏,16世纪下半叶以后,指以新进士人为主体的统治阶级。高丽初期制定文武官人身份制度,朝仪时,文官位列东侧,称文班或东班;武官位列西侧,称武班或西班,合称文武两班或东西两班,简称两班。武?嗟匚皇贾盏陀谖陌唷3湫胁裉锟疲垂傥环指厣搅郑魑湔魇兆馑暗乃教铮⒂妹坠戎Ц顿郝弧8呃鐾醭袄畛捌冢淙皇敌锌凭僦疲桨嘀械母吖僖恢蔽Τ肌⒐笃菟加小@畛衅冢桨嘀锌靠凭俪晌倭诺?"士林派"与功臣贵族组成的"勋旧派"为争夺官爵,党争迭起,彼此诛戮。所谓"士祸"就是这种争斗的反映。16世纪后半期以后,士林派完全掌握权力,此后不仅"两班"的内容有所改变,范围也广为扩大。李朝后期两班渐趋衰落,1894年甲午改革宣布废除两班特权,但无实效,两班继续存在到李朝末年。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。