1) Baling River bridge
坝陵河大桥
1.
Stability and engineering effect of Baling River bridge′s west bank slope in alpine gorge area
高山峡谷地区坝陵河大桥西岸边坡稳定性及工程效应
2.
Study on Engineering Effect of Baling River Bridge High Slope in Alpine Gorge Area
高山峡谷地区坝陵河大桥西岸高边坡工程效应研究
2) Balinghe bridge of Guizhou
贵州坝陵河
4) Ming Tombs Reservoir Dam
十三陵水库大坝
1.
Analysis on impacts from Olympic events on long-term stability of Ming Tombs Reservoir Dam
奥运赛事对十三陵水库大坝长期稳定性的影响分析
5) Caiyuanba bridge guardrail
菜园坝大桥
1.
Anti-corrosive protection, related finishing process and quality test criterion for Caiyuanba bridge guardrail are introduced.
介绍了菜园坝大桥护栏的防腐涂装、配套涂装工艺及质量检测标准。
6) Yellow River bridge
黄河大桥
1.
High-pier simple construction method of Yellow River bridge;
黄河大桥高墩简易施工方法
2.
The Welding Technique of Steel Beam Monolithic Gusset for Sunkou Yellow River Bridge;
孙口黄河大桥钢梁整体节点的焊接技术
3.
Acccording to the situation of concrete works for the bearing platforms, this article describs the methods of the quality control of concrete works in winter for the bearing platforms of the piers in the Yellow River Bridge, especially in the method of controlling the thermal cracks of concrete.
根据承台混凝土现场施工情况 ,介绍了黄河大桥桥墩承台冬季施工质量控制 ,尤其是温度原因引起的混凝土裂缝的控制方法。
补充资料:坝陵河大桥
坝陵河大桥为主跨1088米的单跨钢桁加劲梁悬索桥,桥梁全长2237米,桥面至坝陵河水面370米,是泸瑞国道主干线上镇胜高速公路的一座特大型桥梁,也是目前国内最大的悬索桥。大桥距离黄果树风景区约7公里,全桥使用各类钢材约6.5万吨,总概算约14.8亿元,计划于2008年8月完工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条