1) new type locomotive brake
新型机车制动机
1.
Development of control software for new type locomotive brake;
新型机车制动机控制软件的研制
2) light-duty locomotive brake
轻型机车制动机
1.
According to problems of YZ-1 brake in engineering machinery vehicle and mine transport vehicle,YZ-1G type light-duty locomotive brake was designed to solve the problem of emergency pressurization,improve reliability,use integrated assembly and aluminum alloy lightening structural component.
针对工程机械车、矿山运输等轻型机车YZ-1制动机使用中暴露出来的问题,新设计试制生产了YZ-1G轻型机车制动机,其主要改进是解决紧急增压的问题,提高可靠性,将原来的分散安装改进为集成装配,结构件的铝合金轻型化设计等。
3) new type of locomotives
新型机车
4) locomotive brake
机车制动机
1.
Present status and development of locomotive brake in China;
我国机车制动机的现状与发展
2.
The algorithm is used in locomotive brake and the application result shows that it can correspond transfer of the frames and it is enable to transfer all of the frames.
通过仿真实验以及机车制动机上的应用表明,该算法在网络资源不充足情况下可以很好地协调不同帧之间的发送,使得所有帧都能正常发送,从而满足机车制动机实时通信的需求。
5) DK-2 locomotive braking system
DK-2型机车制动机
6) light-duty vehicle
轻型机动车
1.
The required data and parameters for CMEM were collected on the base of 9 light-duty vehicles with typical technology characteristics of Beijing.
采用由美国加州大学Riverside分校开发的综合模式排放模型(CMEM)分析和研究北京市机动车污染物的排放特征,以9辆代表北京市典型技术类型的轻型机动车为实验车辆,收集了运行CMEM模型所需要的数据和参数。
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条