说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 并行延时相关
1)  parallel delay correlation
并行延时相关
2)  delayed autocorrelation
时延相关
1.
To deal with the demodulation problem of noised rolling machine defect vibration signal,a new method based on time delayed autocorrelation theory and empirical mode decomposition(EMD) method was presented.
讨论了时延相关算法的降噪原理、离散信号时延相关算法和Hilbert-Huang变换理论。
3)  parallel correlation
并行相关
1.
Using the three outputs,the parallel correlation was developed and it improved the acquiring performance of efficiency and accuracy of the GPS receiver.
阐述了GPS相关器的工作原理和结构,对构成相关器的各个模块进行了详细的理论分析,利用本地产生的C/A码的超前、即时、滞后码与输入信号进行并行相关,提高了捕获的速度和精度,并用verilog硬件描述语言在FPGA中实现了GPS相关器的全部设计。
4)  Delay and Correlation
延时和相关
5)  time-delay auto-associators
时延自相关
1.
A neural network architecture, K-subspaces and time-delay auto-associators, is proposed for phoneme recognition.
提出了用于音素识别的K子空间和时延自相关器神经网络结构,用将时延设计加入线性自相关器,以扩展音素滤波神经网络的方法,产生p维子空间,并采用迭代过程修改划分,以便捕获语音信号中的时间序列信息。
6)  Correlative Phase Discrimination
并行相关鉴相
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条