1) Beixi Hydropower Station
北溪水电站
1.
Application of H9000 Computer Supervisory Control System to Beixi Hydropower Station;
H9000计算机监控系统在北溪水电站的应用
2) Qingxi Hydropower Plant
清溪水电站
1.
Construction Organization and Utilization of excavated Waste in Qingxi Hydropower Plant;
清溪水电站施工组织与开挖弃碴利用
3) Zhexi Hydropower Station
柘溪水电站
1.
Slope Deformation Analysis of Switch Station of Zhexi Hydropower Station;
柘溪水电站开关站边坡变形分析
4) Panxi Hydropower Station
盘溪水电站
1.
In order to study its impacts to the dam safety and judge the harmful erosion on concrete due to surrounding water quality, we test and study the water quality and sludges of Guanyinshan Reservoir and the reservoir for Panxi Hydropower Station and sum up the causes of sludges and the effects on the dam caused by its different composit.
在我国已建成并运行多年的许多大坝坝内廊道或基础廊道的排水孔和水沟中均发现有地下水析出物,为研究其对大坝安全的影响、判断环境水质是否对混凝土存在有害性侵蚀,对观音山水库和盘溪水电站水库水质和析出物进行了试验研究,总结了析出物的成因和各成分对大坝的影响,为评价大坝的安全性提供了依据。
5) Shanxi Hydropower Station
珊溪水电站
1.
Several problems of deformation monitoring on the Dam of Shanxi Hydropower Station;
珊溪水电站大坝变形监测中的若干问题
6) Tuoxi hydropower station
托溪水电站
1.
In order to use the downstream reservoir drawdown of Tuoxi hydropower station and increase the generated electricity,this paper puts forward a way of analysis,calculation and economic comparison and selection,which can be discussed.
梯级水电站开发中,经常遇到上下两个梯级电站的水位街接问题,托溪水电站利用下游水库消落水头,增加 发电效益,并提出了分析、计算,进行了经济比选,其思路和方法,可供探讨。
补充资料:溪水
1.指从山里流出来的水流。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条