1) drainage system
除涝排水
1.
Optimization of planning for drainage system in plain polder area based on experimental genetic algorithm;
基于试验遗传算法的平原圩区除涝排水系统最优规划
2) plain polder region
除涝排水系统
1.
Application of ANN method to real-time operation of drainage system in plain polder region;
平原圩区除涝排水系统实时调度中的神经网络方法研究
3) draining waterlogging
排水除涝降渍
4) operation of drainage system for water-logging control
除涝排水系统调度
5) waterlogging water pumping and drainage
涝水抽排
1.
In the light of the waterlogging forming reasons in the built area and combined with the areal drainage conditions, the planning is considered to adopt the principle of high water level and high-speed drainage, low water level and low-speed drainage, and waterlogging water pumping and drainage for prevention.
该文介绍城市内涝灾害的形成原因,探讨城市治涝的设计标准,针对已建成区的内涝成因,结合地域排水条件,在规划中考虑采用高水高排、低水低排、涝水抽排的原则进行防治。
6) surface and subsurface waterlogging
涝渍排水
1.
A Study on the drainage index for combined control of surface and subsurface waterlogging;
涝渍排水控制指标的初步研究
补充资料:除涝规划
除涝规划
surface drainage criterion
规定的排水设施的除涝能力。即计划达到的除涝能力故也叫设计除涝标准。 除涝标准的表达方法有二:①以消除一定频率的涝灾为设计标准。涝灾的频率分析需有多年的观测资料,计算比较复杂;故通常以排除一定重现期的暴雨所产生的径流作为除涝工程的设计标准,例如,以排除5年一遇的暴雨所产生的径流作为设计标准,则称为5年一遇的除涝设计标准。②以历史上产生涝灾比较重的某年实际发生的暴雨作为除涝设计标准,不用频率概念。因为径流量不仅与降雨量有关,还与降雨强度及前期影响雨量有关,故选一定频率的暴雨量计算径流量,仍然含有不确定因素。而直接选用某年实际发生的暴雨及相应的径流量作为典型进行除涝设计,概念更为明确。中国目前对除涝标准没有统一规定,各省根据当地的具体条件,提出适合本地区的标准。例如:吉林省的除涝设计标准为一次降雨量120毫米;北京、上海和四川等地为日雨量200毫米;有些省份采用三日雨量200一250毫米,甚至采用三日雨量300一350毫米。 设计除涝标准的选定,主要取决于除涝工程的经济效果。标准过低,不能满足农业发展需要,经济效益不明显;标准过高,将占用过多劳力和投资并增加年费用,净效益可能下降。因此要根据各地区社会经济条件和工程条件,通过技术经济论证,优选设计除涝标准。一般说来.产值低的,工程难度大的地区,除涝标准要相对低些。同一流域内部,各分区的排水条件、工程难度及其工程效益不尽相同,故各分区的除涝标准也应有所不同。目前,中国平原区的设计除涝标准约为3年到5年一遇,纤区设计除涝标准约为5年到10年一遇,部分经济发达地区达到10年一遇,超过10年一遇的为数很少。关于除涝设计中降雨日数的选择与设计工程的汇水面积以及境内有无调蓄径流的设施有关。流域面积越大,形成最大流量的降雨历时越长。有调蓄设施的排水区,其最大流量取决于长历时暴雨。机械排涝站为减少基建投资和提高设备利用率,应适当采取滞涝措施并选用长历时暴雨。 (许益科)Chulao biaozhun除涝标准(surfaee drainage eriterion)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条