1) generator neutral point
发电机中性点
1.
The paper focuses on how to lower zero sequential current in generator neutral point efficiently.
在单机容量800 kW及以下的低压小型水电站中,由于发电机本身的制造工艺,发电机中性点运行方式等原因,实际运行中,发电机中性点有时有很大的零序电流通过,它对电站的安全运行带来故障隐患,但只要针对电站的实际情况,采取一定的措施,就能有效降低发电机中性点的零序电流。
2.
The generator neutral point of Hubei Tiantang Pump-storage Power Station adopts the earthing scheme through distribution voltage transformer with secondary load resistance.
湖北天堂抽水蓄能电站发电机中性点采用带二次负载电阻配电变压器的接地方式。
2) generator neutral
发电机中性点
1.
Discussion on generator neutral grounding methods;
发电机中性点接地方式探讨
2.
At bidding design stage of Baise Multipurpose Dam Project, the main wiring diagram of Baise HPP is optimized, including the design of a generator circuit breaker for each generator_transformer connection unit, and high_impedance earthing mode for generator neutral.
介绍百色水利枢纽在招标设计阶段中对水电站电气主接线进行的优化设计,包括在每个发电机-变压器单元接线均装设发电机出口断路器,以及发电机中性点采用高阻抗接地方式等内容。
3) generator neutral point resistance cubicle
发电机中性点电阻柜
4) Generator neutral grounding
发电机中性点接地
5) generator neutral grounding equipment
发电机中性点接地设备
6) generator neutral point
电机中性点
1.
Application of 300MW generator neutral point adopting arc suppression coil compensation ground in Daba power plant;
300MW发电机中性点采用消弧线圈补偿接地方式在大坝电厂的应用
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条