说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 投料竖井
1)  charging shaft
投料竖井
2)  feeding material to shaft
竖井投料
1.
Analysis of restoring test for feeding material to shaft in water delivery tunnel of Dahuofang reservoir;
大伙房水库输水工程隧洞施工竖井投料还原试验分析
3)  shaft plumbing
竖井投点
1.
This paper intreduces accuracy analysis of forward intersection determine shaft plumbing vertical and for shaft plumbing vertical error of point position or directional error carry through simple analysis.
简要叙述了前方交会法确定竖井投点垂线的方法 ,对投点垂线的点位误差及方向误差进行了初步分
4)  batching mine
投料井
1.
The key problem of transporting system is that the pipeline in filling batching mine can t be plugged,or while plugging,it can be found timely and the transporting system on ground controlled to stop.
充填物料以垂直方式运送到井下,其运输系统关键是垂直投料井管道不被堵塞,或是被堵塞能及时发现并控制井上运输系统停机。
5)  shaft well
竖井
1.
The most of shaft wells of TGP s permanent shiplock characterize as large section, shaft well group, double steel bar, and large amount of accurately embedded metal structure and especially for the lower shiplock chamber section, the structure is complicated and the steel bar is dense.
三峡水利枢纽永久船闸竖井多为大断面、多井群组合结构,且为双层钢筋,又有大量高精度要求的金结埋件,尤其是下部闸室段结构复杂,钢筋密集,因此工作量大,施工干扰大,施工难度大。
2.
The outfall pressure shaft well in the third-step pumping station of main canal of Wanjiazhai Huanghe Water Transfer Project in Shanxi Province is lined with reinforced concrete and constructed by using hydraulic climbing form.
山西省万家寨引黄工程总干三级泵站出水压力竖井为钢筋混凝土衬砌 ,采用了液压滑升模板施工 ,节省了多次立模和拆模工序 ,加快了施工进度。
3.
In order to protect the cast concrete at the shaft well section of the power tunnel against corrosion by several strong corrosive mediums,a protection project at the outer sidewall of the shaft well is needed.
“6 35”水利枢纽已浇筑的发电洞竖井混凝土受到多种强腐蚀介质的侵蚀影响 ,需在竖井外壁进行加强性工程防腐处理 。
6)  silo [英]['saɪləʊ]  [美]['saɪlo]
竖井
1.
Application of gyroscope in the directional silo measure;
陀螺仪在竖井定向测量的应用
2.
Numerical Simulation of Fan Influence in Long and Large Road Double-silo Tunnel Intake and Exhaust Ventilation Mode;
长距离大直径公路隧道双竖井送排式通风中风机影响的数值模拟
3.
The Protection Methods and Construction Techniques for Under Drain and Silo of Karez;
坎儿井暗渠和竖井防护措施及施工技术
补充资料:化工投料试车
分子式:
CAS号:

性质:化工试车的最后阶段。始于将设计文件规定的原料投入生产装置(一个工厂或其中某些装置),终于生产出合格产品。以打通生产工艺流程,生产出合格产品为目标,强调安全、稳定,不强求高技术经济指标。一般不包括生产考核。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条