1) Substituted ratio of project time and cost
工期成本替代率
2) substitute cost
替代成本
1.
Based on the analysis of the theoretical shortcomings of enterprise surplus arrangement, the substitute cost of participant resources was proposed as the key factor determining the residual distribution proportion in order to resolve the problem that marginal contribution and risk, as the standard of determining the residual claims, are difficult to calculate.
为了解决按边际贡献和风险大小安排企业剩余索取权难以度量的问题,通过分析企业剩余分配在理论上的缺陷,提出按参与资源的替代成本确定企业剩余分配。
3) Cost Substitution
成本替代
4) The rate of wage substitution
工资替代率
5) construction period cost
工期成本
1.
This paper discusses on the project-based financial cost control of the construction enterprise from aspects of the quality cost control, safety cost control, construction period cost control, and late stage cost control, etc.
从质量成本控制、安全成本控制、工期成本控制、工程的后期费用控制等方面论述了施工企业项目财务成本的控制。
6) time cost
工期成本
1.
Method to determine optimum contract bid on consideration of time cost;
考虑工期成本时确定最优报价的方法
2.
This paper introduces a method, that set up a model of linear programming in networks time cost analysis, and illustrates the application of the method through a example.
介绍了用单纯形法求解网络最优工期成本方案的步骤和方法,重点介绍了数学模型的建立原理和步骤。
补充资料:边际技术替代率
是指在产出量保持不变的条件下,用一种投入要素Y替代另一种投入要素X的技术上的比率。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条