1) existed workshop
既有厂房
1.
After inner deep excavation of large area in an existed workshop,the column base near the slope of foundation pit has an appreciable horizontal displacement due to soil pressure,which results in severe cleavage of the columns.
某既有厂房内部大面积深开挖后,基坑边坡附近的柱基础因土压力作用发生明显的水平位移,柱身严重开裂。
2) Existing buildings
既有房屋
1.
The realistic sense of story-adding for existing buildings is discussed.
阐述了既有房屋加层改造的现实意义,简要介绍了国内外既有房屋加层改造的发展历史、现状和趋势。
3) existing building
既有房屋
1.
The application of new sample plan in concrete compressive strength inspection of existing buildings structure;
新型抽样技术在既有房屋混凝土强度检测中的应用
2.
Approach of sampling plan for quality inspection of element in existing building;
既有房屋构件质量评定检测抽样技术研究
3.
Methods suitable for evaluating the feasibility of various upgrading schemes for existing buildings are few currently.
目前对既有房屋加层改造的方案决策还缺乏科学系统的方法。
4) used masonry building
既有砌体房屋
1.
Two kinds of design of reforming the used masonry building to large space construction,including "replace brick wall with bearing beam" and "replace brick masonry structures with partial bottom frame",are discussed in this paper.
本文讨论了两类既有砌体房屋大开间改造工程——"墙承重改为梁承重"和"形成局部底部框架砖房"的设计,分析了结构计算的内容和设计方法,并提出了加固补强的途径。
6) haven-built
既有
1.
Thinking about haven-built architectural engineering quality safety
既有建筑工程质量安全性的思考
补充资料:安装钢结构厂房钢柱
安装钢结构厂房钢柱
巍 安装钢结构厂房钢柱
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条