It introduces some treatment measures of wet and sunken loess foundation,analyzes the foundation treatment principle according the characteristics of the wet and sunken loess,and represents the foundation treatment method that is soil cushion treatment first and the densely covered lime-soil pile treatment second,which show this treatment method having good effectiveness.
介绍了处理湿陷性黄土地基的几种处理措施,根据湿陷性黄土的特点,分析了其地基处理机理,阐述了以土垫层处理为主,密布灰土桩为辅的地基处理方法,表明了这种处理方法具有良好的效果。
2) lime soil compaction pile
灰土挤密桩
1.
The principles and construction of lime soil compaction pile strengthening collapsible loess foundation;
灰土挤密桩加固湿陷性黄土地基机理与施工
2.
The application of lime soil compaction pile in virtual filling treatment;
灰土挤密桩在虚填土处理中的应用
3.
It illustrates looping design principle for humid loess,which is based on looping reinforcement of humid loess,combined with specific engineering it introduces design and construction method of lime soil compaction pile, it can be referred for similar engineering.
基于湿陷性黄土围箍加固技术原理,阐述了湿陷性黄土围箍设计原则,结合工程实例,详细介绍了灰土挤密桩设计与施工方法,对类似工程具有可应用性和推广价值。
3) lime-soil compaction pile
灰土挤密桩
1.
Application of the collapsible loess foundation treatment with the lime-soil compaction pile;
灰土挤密桩处理公路湿陷性黄土地基的应用
2.
Engineering application of composite foundation of lime-soil compaction pile and CFG pile;
灰土挤密桩与CFG桩复合地基在工程中的应用
3.
Swelling soil foundation treatment with lime-soil compaction pile;
灰土挤密桩处理弱膨胀土路基
4) lime-soil compacted pile
灰土挤密桩
1.
Application of lime-soil compacted pile for humid loess foundation treatment;
灰土挤密桩在湿陷性黄土地基处理中的应用
2.
Stress analysis of lime-soil compacted pile based on the unified strength theory;
基于统一强度理论的灰土挤密桩应力分析
3.
The field loading test of single pile and three piles composite ground are studied combining the construction of lime-soil compacted pile in collapsible loess foundation.
结合灰土挤密桩处理湿陷性黄土地基工程实际进行了单桩、三桩复合地基静载荷现场试验。
5) compacted ash residue soil column
挤密灰渣土桩
1.
By introducing a new foundation treatment technology named expanded and compacted ash residue soil column composite foundation by using heavy hammer,controlling construction process and analyzing detection result,heavy miscellaneous fill layer s collapsibility can be eliminated and its bearing capacity of composite foundation soil can reached to 200kPa.
介绍了一种处理深厚杂填土地基的新技术———重锤冲扩挤密灰渣土桩复合地基技术,并对施工过程的控制,以及施工效果的检测结果进行了分析,得出了对于大面积深厚杂填土地基采用此技术处理后,能够消除地基深部湿陷性,复合地基承载力可以满足200 kPa。