1) pillar
塔座
1.
The article introduces the preventing measure,implementing process and effects of temperature in the pillar construction.
文章简单介绍了在塔座施工中采取的温度控制措施、实施过程及效果。
2) turret ring
炮塔座圈
1.
Aiming at the existing problems of poor sealing effect and service and maintenance of an amphibious tank′s turret ring,this paper adopts a particular technique scheme which takes the solution combining active sealing and passive fast clearout and conducts specific design and true-vehicle tank experiment for this solution,which validates the feasibility and validity of this scheme.
针对某水陆坦克炮塔座圈存在密封效果差、维护保养困难等问题,提出了主动密封和被动快速清洗相结合的解决方案,并对方案进行了具体的设计和实车试验,验证了方案的可行性和有效性。
3) tail rotor pylon
尾桨塔座
4) aft rotor pylon
后旋翼塔座
5) concrete tower support
钢筋混凝土塔座
6) turret race ring grips
炮塔座圈卡板
补充资料:塔座
1.僧尼讲经时的座位。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。