1) Nalan Hydropower Station
那兰水电站
1.
Concrete Face Gravelfill and Rockfill Dam of Nalan Hydropower Station on Deep Alluvium;
趾板置于覆盖层的那兰水电站面板砂砾石坝设计研究
2) Naxin Hydropower Station
那新水电站
1.
Test Research on Flip Bucket Structure of Spillway Outlet at Naxin Hydropower Station;
那新水电站溢洪道出口挑坎结构形式的试验研究
3) Naen Hydropower Plant
那恩水电站
1.
Based on a detailed introduction of the design process of construction diversion tunnel for Naen Hydropower Plant,the author analyzed the diversion standard and measure for main dam construction,demonstrated the layout of freeflow diversion tunnel and hydraulic calculation,and discussed the tunnel lining and cofferdam elevation.
详细介绍了那恩水电站施工导流隧洞的设计过程,分析了大坝施工导流标准和方式,论述了无压导流隧洞的布置、水力计算,并对导流洞的衬砌,围堰高程的确定进行了探讨。
4) Nina hydropower station
尼那水电站
5) Naban hydropower plant
那板水电站
1.
An introduction was made on the configuration and technical features of micro-computer comprehensive automation system of Naban hydropower plant,including hardware,software and functional design.
介绍了那板水电站微机综合自动化系统的系统结构及技术特点,硬件、软件配置及功能设计,分析了该系统投运后对整个电站提高劳动生产率、操作自动化及设备管理水平等产生的积极效果。
6) Zilanba hydropower project
紫兰坝水电站
1.
Design of prestressed piers of release gate for Zilanba hydropower project;
紫兰坝水电站泄水闸预应力闸墩设计
补充资料:考兰水电站
考兰水电站 |
Khao Laem Hydropower Station |
概 述 |
位于泰国北碧府Quae Noi河上,距首都曼谷西北270km。工程主要为了发电、兼顾灌溉。混凝土面板堆石坝,最大坝高130m,水库总库容80亿m3,面积365km2;水电站装机容量30万kW,年发电量7.7亿kW·h。工程于1980年开工,1985年竣工。 |