说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最大冲刷深度
1)  maximum scour depth
最大冲刷深度
1.
Based on the date on scour around the rises system, the evolutionary processes of local scour, as well as the influence of wave and current parameters (water depth, current velocity, wave and so on) on maximum scour depth are studied.
试验结束后,得到各组参数下的冲刷后地形、冲深监测点的历史冲刷曲线及最大冲刷深度
2.
The scoured terrain of the sea bottom as well as the scour depth-time curve and maximum scour depth at different inspection points were recorded.
通过实验观测立管系统周围海底地形的冲淤变化过程,得到冲刷稳定后的地形形态、各冲深监测点的冲深历时曲线及最大冲刷深度
2)  the maximum scour depth
最大冲刷深度
1.
The experiment results show that the maximum scour depth has relation to the runoff and the longitudinal axis trend of main abutment: the maximum scour depth is equal to 11.
试验结果表明主桥墩最大冲刷深度与上游径流量及主桥墩轴线走向有关:对径流为百年一遇洪水流量,主桥墩轴线走向与水流流向一致时,其最大冲刷深度为11。
3)  maximum scouring water depth
最大冲刷水深
1.
Counting on the maximum scouring water depth in river bend;
河湾最大冲刷水深计算研究
2.
This paper has discussed the river bend flow characteristics,the maximum scouring water depth position,and the protection range of river bank.
对河湾水流特征、河湾最大冲刷水深位置、河湾防护范围进行探讨。
4)  scour depth
冲刷深度
1.
The examinational study on the local scour depth of roadbed along river;
沿河路基局部冲刷深度的试验与分析
2.
Research on local scour depth calculation of roadbed along river;
沿河路基局部冲刷深度计算研究
3.
Investigation on characteristics and scour depth of flow in river bend;
河流弯道水流特点与冲刷深度探讨
5)  scouring depth
冲刷深度
1.
Estimation method of scouring depth of lower reach of hydro-junction;
枢纽下游河床冲刷深度估算方法
2.
Discussion the scouring depth recommended by "Levee Engineering Design Standard";
对《堤防工程设计规范》推荐冲刷深度公式的探析
3.
Based on this research,the model nearby superposed flow spur and the velocity distribution of spur head flow were built,At last,a theoretical formula of scouring depth around pile permeable spur dike was derived from the models.
针对其区域水流特性及局部冲刷,通过理论分析,并结合试验验证,分析了其局部水头损失机理,得出了正挑桩式丁坝壅水高度的计算公式,建立了坝头水流的叠加模式和坝轴断面的流速分布式,导出了其局部最大冲刷深度的理论计算公式。
6)  depth of scour
冲刷深度
1.
Taking Bayin River Crossing as an example,which is only a sechis of Hydraulic Protection Project for Sebei-Xining-Lanzhou Gas Transportation Pipeline,we have calculated the depth of scour in this section by using the scouring empirical formulae that have been widely used in the pipeline engineering.
以"涩宁兰输气管道巴音河穿越段水工保护工程"为实例,采用管道河流穿越工程中广泛应用的冲刷经验公式,对该穿越段的冲刷深度进行计算,通过对比分析各计算结果的合理性与可靠性,提出了符合实际情况的水工保护工程基础埋置深度,为油气输送管道穿越段水工保护工程设计与工程基础埋深的确定提供了技术参考和较可靠的科学依据。
补充资料:最大的最大收益值准则
分子式:
CAS号:

性质: 也称最大的最大收益值准则。不确定型决策准则之一。其方法是:首先找出各方案的最大收益值,然后选择这些最大收益值中最大者所在的方案作为最满意方案。这个准则采取乐观主义态度,把方案最大收益值(或最小损失值)的自然状态,作为必然出现的自然状态采看待,从而把不确定型决策问题化为确定性决策问题来处理。选择最大收益值中最大的方案(对损失值来说就是选择最小损失值中最小的方案)作为最满意的方案,即取“最有利中之最有利”方案,所以亦称为“乐观的决策准则”。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条